Difference between revisions of "RunPlanDaily CREX"
From PREX Wiki
Line 18: | Line 18: | ||
|- | |- | ||
| Day | | Day | ||
− | | Production | + | | Production, change IHWP, check target pressure with large raster |
| | | | ||
|- | |- | ||
Line 31: | Line 31: | ||
|- | |- | ||
| Day | | Day | ||
− | | Production | + | | Production, detector alignment check (once FFB is on) |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | Production |
| Possibly do optics? | | Possibly do optics? | ||
|- | |- |
Revision as of 16:52, 15 December 2019
CREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Comments/Status |
---|---|---|---|
Saturday, December 14 | Owl | Production | |
Day | Production, change IHWP, check target pressure with large raster | ||
Swing | Production | ||
Sunday, December 15 | Owl | Production | |
Day | Production, detector alignment check (once FFB is on) | ||
Swing | Production | Possibly do optics? | |
Monday, December 16 | Owl | Production | |
Day | Production | ||
Swing | Production | ||
Tuesday, December 17 | Owl | Production | |
Day | No beam if we have good running over weekend and Hall C is ready | ||
Swing | |||
Wednesday, December 18 | Owl | ||
Day | |||
Swing | |||
Friday, December 20 | Owl | ||
Day | |||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history CREX
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting