RunPlanDaily CREX
From PREX Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
CREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Wednesday, December 4 | Owl | No shift | |
Day | Magnet work... | ||
Swing | Magnet work...until Jack ready to leave 4-8pm. Then 5pass tuning into A. | ||
Thursday, December 5 | Owl | Then 5pass tuning into A. | |
Day | RF stress test to A/RF fixing | Burned up 3 raster power supplies (ended test at 4:15pm) | |
Swing | Septum problem (only up to 400 A); collimator centering; polarity check | Set HRS tune P for this septum setting | |
Friday, December 6 | Owl | spectrometer setup did not allow target alignment checks | Beam gone at 3:40am due to Network issue |
Day | Hall surveyed/controlled access all day; remove diffusor at end? | Septum fix complete; network issues being run down; raster sync | |
Swing | lock up; continue low current commissioning | Target hole position | |
Saturday, December 7 | Owl | commissioning | |
Day | commissioning/ Q2 measurement and Spectrometer rescattering | https://prex.jlab.org/wiki/index.php/RescatteringPlan | |
Swing | commissioning | ||
Sunday, December 8 | Owl | commissioning | |
Day | commissioning | ||
Swing | commissioning | ||
Monday, December 9 | Owl | commissioning | |
Day | diffusor out (if not already); spin dance? | Spin dance if Hall C ready | |
Swing | commissioning/production | ||
Tuesday, December 10 | Owl | commissioning/production | |
Day | production | ||
Swing | production |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history CREX
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting