Taking MAIN detector Counting Run
From PREX Wiki
Jump to navigationJump to searchThe printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- Set the HV for DN-Quartz (MAIN) detectors in both arms to -1900V (as explained in HVgui)
- L1.1 channel in S1 (Slot1) in each arm HV GUI (See Image 1)
- Enable the HV channels
- Turn ON scintillators
- Turn ON VDCs (NOTE:Make sure the scintillator rate is below 500k before turning VDC ON)
- Take counting runs on both arms (LHRS and RHRS) atleast 200k events
- To analyze the runs:
- ssh -Y a-onl@aonl1
- goprex
- analyzer -l
- .x setup2.C(runNumber,200000)
- To produce plots:
- In a-onl@aonl1 machine:
- cd devi/crex/alignment
- analyzer prex_counting/prexLHRS_runNumber_200000.root for LHRS
- analyzer prex_counting/prexRHRS_runNumber_200000.root for RHRS
- .x alignDS.C
- Note: please don't modify the macro, if you want you can copy it to your directory and modify there
- Look into the elastic peak and read the edge of quartz (the intersection of red and blue histograms in "Projected x on detector plane" plot)
- Zoom in to see the precise edge
- When you are done with taking counting data turn OFF the DN-Quartz (MAIN) detectors HVs
- NOTE: never turn ON DN-Quartz HVs during high current production running keeping them at higher HV (they will die)
- For safety, set their HV t0 0V at the end