Line 6: |
Line 6: |
| ! style="width:40%"| Task Name | | ! style="width:40%"| Task Name |
| ! style="width:20%"| Owner | | ! style="width:20%"| Owner |
− | ! style="width:20%"| Last Deadline | + | ! style="width:15%"| Deadline |
− | ! style="width:20%"| Wikipage | + | ! style="width:25%"| Wikipage / Complete |
| |- | | |- |
− | | Design and Simulation || Kent Paschke || Dec 2018 || [[TL-DesignAndSim | wikipageLink]] | + | | align="left" | '''1. Design and Simulation''' || Kent Paschke || Dec 2018 || [[TL-DesignAndSim | wikipageLink]] |
| + | |- |
| + | | align="left" | 1.1 Radiation Benchmarking || Kent Paschke || Dec 2018 || <span style="color:green">Complete</span> |
| + | |- |
| + | | align="left" | 1.2 Base design (v3 benchmarks) || Ciprian Gal || March 2018 || <span style="color:orange">Ongoing</span> |
| + | |- |
| + | | align="left" | 1.3 Other experimental setups || Adam Jec || April 2018 || <span style="color:red">TODO</span> |
| + | |- |
| + | | align="left" | '''2. Analysis chain''' || Kent Paschke || Dec 2018 || [[TL-AnalysisChain | wikipageLink]] |
| |} | | |} |
− |
| |
− | == Radiation Benchmarking ==
| |
− | * ERR recommendation
| |
− | * Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark
| |
− |
| |
− |
| |
− |
| |
− | == Design and Simulation ==
| |
− | ===Base design, v3 Benchmarks.===
| |
− | <<Complete by March 16>>
| |
− | * Need new benchmarks (accounting for updated geometry (dump, HRS) and SAMS
| |
− | ** for PREX-I, HAPPEX-II, PREX-2, CREX (and others?)
| |
− | ** on HRS detectors, under HRS detectors, Hall Lid or Hall Wall total ("whole hall"), and Hall Lid skyshine estimates
| |
− | * prex2-v3:
| |
− | ** prex-2 dump, with shield
| |
− | ** no SAMS, or alternative SAMs?
| |
− | *crex2-v3:
| |
− | ** (same with 48Ca target and 2.1 GeV)
| |
− | * prex1-"??name??"
| |
− | ** PREX-I collimator
| |
− | ** PREX-I chamber? (not as important)
| |
− | ** PREX-I dump (with KW correction)
| |
− | ** no HDPE, no SkyshineShield
| |
− | ** Full size HRS det and structure, match prex2
| |
− | ** FULL PREX-I SAMS
| |
− | * HAPPEX-II - ??name??
| |
− | ** HAPPEX-II collimator (same as PREX-I?)
| |
− | ** PREX-I dump (with KW correction)
| |
− | ** 3.2 GeV, 20cm LH2
| |
− | ** PREX-I chamber (not as important)
| |
− | ** no HDPE, no SkyshineShield
| |
− | ** Full size HRS det and strucutre, match prex2 sim
| |
− | ** FULL PREX-I SAMS
| |
− | * PV-DIS?
| |
− | * HAPPEX-3?
| |
− | * TRITIUM (11 GeV)?
| |
− | * DVCS?
| |
− |
| |
− | ===Geometry, Next iteration.===
| |
− | <<Complete by April 6>>.
| |
− | * realistic gaps around dump shield
| |
− | * target chamber
| |
− | * collimator chamber to match design
| |
− | * HDPE around target to match design
| |
− | * modified SAM design?
| |
− |
| |
− | ===Magnetic Shielding===
| |
− | * Evaluate B-field in Q1 beampipe with only one Q1 energized
| |
− | * Evaluate the Tritium-Magnetic-shield design
| |
− | * Evaluate mag shield additions for upstream/downstream septum beampipe
| |
− |
| |
− | ===O-Ring damage===
| |
− | * Plots:
| |
− | ** E-weighted, electron only plots from beamline det an o-ring det
| |
− | ** tables to arrive at integrated grays
| |
− | **hall-lid det x0/y0 plot to show enhancement from full SAMS
| |
− | * get info on O-ring from engineering. (material, lifetime expectations, also when did this appear?)
| |
− | * Full base design (Feb18), but w/o dump shield
| |
− | ** Use Al around O-ring
| |
− | *** No SAMS
| |
− | *** PREX-I SAMS
| |
− | ** test 1/2 size O-ring (PREX) (PREX-I SAMS)
| |
− | *** Done, but dumb results. Compare 1/2 size O-ring with 1/2 of full size O-ring.
| |
− | ** test no material around O-ring (PREX) (PREX-I SAMS)
| |
− | ** CREX
| |
− | *** No SAMS
| |
− | *** PREX-I SAMS
| |
− | ** check beam-offset run
| |
− | * Results for alternative SAM configs
| |
− | * Final estimate use full base design (Feb18), including dump shield
| |
− | ** PREX-2
| |
− | ** CREX
| |
− |
| |
− | ===SAM redesign===
| |
− | * calculate rates vs angle
| |
− | * calculate doses vs angles
| |
− | * get details on beer can, make default design including welding
| |
− | * Attempt final design
| |
− | * Propose/Exam alternative SBMs
| |
− |
| |
− | ===Activation Estimation===
| |
− | * Downstream septum beampipe flange, contact dose
| |
− | * Downstream septum beampipe flange, whole body dose
| |
− | * CREX activation estimates
| |
− | * HDPE activation.
| |
− | * DUST ACTIVATION?
| |
− |
| |
− | ===HDPE parameters===
| |
− | * Total / peak radiation dose. Damage?
| |
− | * spec non-flamable HDPE, or devise fireproofing
| |
− |
| |
− | ===Thermal Neutrons:===
| |
− | * count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power
| |
− | * plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors
| |
− | * consider effect of 5% boron
| |
− | * calculate thermal neutrons at Compton polarimeter
| |
− |
| |
− | === Polarimeter doses ===
| |
− | * Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations
| |
− | ** Moller target holder uses o-ring (evaluate dose)
| |
− |
| |
− | === Spectrometer Optics Design ===
| |
− | * FOM optimization
| |
− | * Q1 collimator cut-out
| |
− |
| |
− | == Analysis Chain ==
| |
− | * First attempt at new analyzer <<June deadline>>
| |
− | * Test on PREX1 data.
| |
− | ** (Re)Create plots that were used to verify PREX1 data integrity/quality
| |
− | ** Add analysis and drawing macros to analyzer package
| |
− | * Create fake PREX2/CREX data with updated names and addresses for BCMs, BPMs.
| |
− | * Use macros to create online monitoring GUIs
| |
− | ** Add warning messages for online monitoring for shift crew
| |
− |
| |
− |
| |
− | == DAQ / Slow Controls ==
| |
− | * Multicrate running.
| |
− | * Sync monitor.
| |
− | * Test fast event transfer to online monitor/feedback at 240 Hz
| |
− | * ADC maintenance - number of channels, etc
| |
− | * BCM, digital cavity receivers - verify functioning
| |
− | * Select which BPMs should be in the data stream. very proper functioning at 240 Hz
| |
− | * slow controls
| |
− |
| |
− |
| |
− | == Beam Modulation System ==
| |
− | * Testing of installed hardware
| |
− | * Evaluation of accelerator interface software
| |
− | * Coordination with other halls, scheduling committee
| |
− | *Beam modulation software (Hall)
| |
− | ** modulation process
| |
− | ** slow control / monitoring
| |
− | ** DAQ interface
| |
− |
| |
− |
| |
− |
| |
− | == Detector Stack ==
| |
− | ===GEMs===
| |
− |
| |
− | ===Integrating Detectors===
| |
− | * Complete Design
| |
− | * Linearity Studies
| |
− | * Plan for Blind tubes in spectrometer hut?
| |
− |
| |
− | ===Detector Mounting Hardware===
| |
− |
| |
− | == Polarized Source / Injector ==
| |
− | * RTP / KD*P?
| |
− | * Test setting limits on spot size
| |
− | * Outline configuration procedure and run-planning
| |
− | * spin-flipper studies
| |
− |
| |
− |
| |
− |
| |
− | == Moller Polarimeter ==
| |
− | * 1 GeV Optics
| |
− | * simulation for acceptance evaluation
| |
− | * target system installation
| |
− | * Plan to establish high-precision Moller polarimetry (ERR recommendation)
| |
− |
| |
− |
| |
− |
| |
− | == Compton Polarimeter ==
| |
− | * Plan to establish high-precision Compton polarimetry (ERR recommendation)
| |
− | * Laser Maintenance and improvement, summer 2018
| |
− | * e- detector, final plan
| |
− |
| |
− |
| |
− |
| |
− |
| |
− | == Documentation ==
| |
− |
| |
− | === Run planning ===
| |
− | * Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation)
| |
− | * Comprehensive List / Planning for survey and alignment tasks
| |
− | * Watercell (pointing) runplan
| |
− | * optics runplan
| |
− | * detector alignment run plan
| |
− |
| |
− | ===Formal===
| |
− | * Finalize OSPs (ERR recommendation)
| |
− |
| |
− | ===Collaboration===
| |