User talk:Jixie Zhang

From PREX Wiki
Revision as of 20:11, 12 June 2010 by Jixie Zhang (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
Plan Duration|Status Personnel
Blinded Tube Test 4 hours (access) D. McNulty, K. Kumar, J. Wexler
Further Current Calibrations with PREx Det 2 hours Z. Ahmed
Transverse Polarization Measurements. 8 hours,
started from 11:00AM, June 12
Setup by J. Grames. Performed by M. Dalton, Mindy
High Statistics Lead Inelastics done A. Camsonne


"LIKE TO DO" Plans.
Plan Duration|Status Personnel
Oversampling by 2 at 120 Hz few days setup by experts
Q2 with GEMs done A. Camsonne, M.Friends
Backgrounds: Dipole Scan, up and down 6 hours, Finish left arm,
right arm measurement is pending
M. Dalton, Mindy
Beam-Induced Linearity Studies 2 hours K. Kumar, K. Paschke, R. Silwal


MAYBE Plans. Rather low priority.
Plan Duration|Status Personnel
Further 10 nA Cavity Monitor Tests 4 hours Z. Ahmed, R. Michaels
calibration of the
cavities with the amplifier
done Z. Ahmed
More Moller Commissioning 12 hours Moller crew (note Sasha is leaving town)

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.