WAC Notes August 26 2020

From PREX Wiki
Revision as of 23:46, 31 August 2020 by Weibin (Talk | contribs) (Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production)

Jump to: navigation, search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 25 2020 << >> WAC Notes August 27 2020

August 26 2020

Daily Meeting BlueJeans


Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 7993
  • NeedCut - Run 7994 -- even after cutting out 110k-115k entries, the shift in bpm12X is still larger than 1mm, need further offline analysis
  • Good - Run 7996
  • Good - Run 7998
  • Good - Run 7999
  • Good - Run 8000
  • Good - Run 8012 -- obvious energy shift, resulting in drop of yield in both arms
  • NeedCut - Run 8013 -- trippy in the last 100k entries (minirun 5), resulting in larger width, cut out some large excursions (not all of them) to bring down the reg_asym_us_avg rms
  • NeedCut - Run 8014 -- large bpm12X excursion (minirun 2: large reg_asym_us_avg.rms ~950 ppm)
  • Good - Run 8015

Production Run List - Slug 204 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • Junk - Run 7992 -- C-1%
  • Junk - run 7995 -- C-hole
  • Junk - Run 7997 -- C-hole
  • Junk - run 8005 -- no beam
  • Junk - Run 8006 -- C-1%
  • Junk - run 8007- 8011: machine work and compton rate

Issues

Updates