Difference between revisions of "WAC Notes August 27 2020"

From PREX Wiki
Jump to navigationJump to search
Line 51: Line 51:
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8032_000Run 8032] -- 3 mins run
+
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8032_000 Run 8032] -- 3 mins run
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8034_000Run 8034] -- < 1 min run
+
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8034_000 Run 8034] -- < 1 min run
 +
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8041_000 Run 8041] --
 
* Junk - Run 8043 -- C-Hole
 
* Junk - Run 8043 -- C-Hole
  

Revision as of 10:51, 28 August 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 26 2020 << >> WAC Notes August 28 2020

August 27 2020

Daily Meeting BlueJeans

Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production

Production Run List - Slug 204 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

Issues

Updates