WAC Notes August 27 2020

From PREX Wiki
Revision as of 23:44, 31 August 2020 by Weibin (Talk | contribs) (Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production)

Jump to: navigation, search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 26 2020 << >> WAC Notes August 28 2020

August 27 2020

Daily Meeting BlueJeans

Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 8016
  • Good - Run 8017
  • Good - Run 8018
  • NeedCut - Run 8019 -- large bpm12X excursion (minirun 2: reg_asym_us_avg.rms ~805 ppm). After cut, there are still some spikes, just leave them there now though the width is a little larger (but still < 800 ppm)

Production Run List - Slug 204 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 8031
  • Good - Run 8033
  • Good - Run 8035 -- an outlier in atr1, Entry$ == 28796, Device_Error_Code = 528
  • Good - Run 8036
  • Good - Run 8037
  • Good - Run 8038
  • Good - Run 8039
  • NeedCut - Run 8040 -- trippy beam; large bpm12X excursion, cut out some of them (not all of them, as in run 80190 to bring down the reg_asym_us_avg rms; double peak in main detectors (not caused bu change of current), which is gone when cut out the large bpm12X excursion.

Non-Production Runs and Bad Runs

Issues

Updates