Difference between revisions of "WAC Notes August 28 2020"

From PREX Wiki
Jump to navigationJump to search
 
(7 intermediate revisions by the same user not shown)
Line 21: Line 21:
 
'''Daily Meeting [https://bluejeans.com/454783784 BlueJeans]'''
 
'''Daily Meeting [https://bluejeans.com/454783784 BlueJeans]'''
  
=== Production Run List - Slug 204 - IHWP OUT - Flip-RIGHT - Production ===
+
=== Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production ===
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8004_000 Run 8004]
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8045_000 Run 8045]
 
+
* NeedCut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8046_000 Run 8046] -- RQ1 trips during this run, take ~5 minutes to recycle, cut out single arm entries; also cut out bpm12X excursion entryies
 
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8047_000 Run 8047]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8048_000 Run 8048]
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
 
* Junk - Run 8043 -- C-Hole
 
* Junk - Run 8043 -- C-Hole
 
* Junk - Run 8044 -- C-Hole
 
* Junk - Run 8044 -- C-Hole
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8049_000 Run 8049] -- no beam
+
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8049_000 Run 8049] -- no beam, RQ1 trips again, and does not come back
* Junk - run 8050-5068 -- machine is down due to CHL ioc problem, and RQ1 power supply problem
+
* Junk - run 8050-8071 -- machine is down due to CHL ioc problem, and RQ1 power supply problem
  
 
== Issues ==
 
== Issues ==
 +
* Bleed through of C beam into A, resulting in high Compton background rate: https://cebaf.jlab.org/dtm/open-events?event_id=7512
  
 
== Updates ==
 
== Updates ==
 
+
* energy change result in jump in detector yield: https://logbooks.jlab.org/entry/3837712
 +
 
[[Category:WAC]]
 
[[Category:WAC]]

Latest revision as of 21:42, 31 August 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 27 2020 << >> WAC Notes August 29 2020

August 28 2020

Daily Meeting BlueJeans

Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 8045
  • NeedCut - Run 8046 -- RQ1 trips during this run, take ~5 minutes to recycle, cut out single arm entries; also cut out bpm12X excursion entryies
  • Good - Run 8047
  • Good - Run 8048

Non-Production Runs and Bad Runs

  • Junk - Run 8043 -- C-Hole
  • Junk - Run 8044 -- C-Hole
  • Junk - Run 8049 -- no beam, RQ1 trips again, and does not come back
  • Junk - run 8050-8071 -- machine is down due to CHL ioc problem, and RQ1 power supply problem

Issues

Updates