Difference between revisions of "WAC Notes August 28 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
(One intermediate revision by the same user not shown) | |||
Line 31: | Line 31: | ||
* Junk - Run 8044 -- C-Hole | * Junk - Run 8044 -- C-Hole | ||
* Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8049_000 Run 8049] -- no beam, RQ1 trips again, and does not come back | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8049_000 Run 8049] -- no beam, RQ1 trips again, and does not come back | ||
− | * Junk - run 8050- | + | * Junk - run 8050-8071 -- machine is down due to CHL ioc problem, and RQ1 power supply problem |
== Issues == | == Issues == | ||
Line 37: | Line 37: | ||
== Updates == | == Updates == | ||
− | + | * energy change result in jump in detector yield: https://logbooks.jlab.org/entry/3837712 | |
+ | |||
[[Category:WAC]] | [[Category:WAC]] |
Latest revision as of 21:42, 31 August 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 27 2020 << >> WAC Notes August 29 2020
August 28 2020
Daily Meeting BlueJeans
Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production
- Good - Run 8045
- NeedCut - Run 8046 -- RQ1 trips during this run, take ~5 minutes to recycle, cut out single arm entries; also cut out bpm12X excursion entryies
- Good - Run 8047
- Good - Run 8048
Non-Production Runs and Bad Runs
- Junk - Run 8043 -- C-Hole
- Junk - Run 8044 -- C-Hole
- Junk - Run 8049 -- no beam, RQ1 trips again, and does not come back
- Junk - run 8050-8071 -- machine is down due to CHL ioc problem, and RQ1 power supply problem
Issues
- Bleed through of C beam into A, resulting in high Compton background rate: https://cebaf.jlab.org/dtm/open-events?event_id=7512
Updates
- energy change result in jump in detector yield: https://logbooks.jlab.org/entry/3837712