Difference between revisions of "WAC Notes August 29 2020"
From PREX Wiki
Jump to navigationJump to search(2 intermediate revisions by the same user not shown) | |||
Line 39: | Line 39: | ||
=== Production Run List - Slug 207 - IHWP IN - Flip-RIGHT - Production === | === Production Run List - Slug 207 - IHWP IN - Flip-RIGHT - Production === | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8103_000 Run 8103] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8103_000 Run 8103] | ||
− | |||
− | |||
− | |||
== Non-Production Runs and Bad Runs == | == Non-Production Runs and Bad Runs == | ||
* Junk - run 8072-8080 -- Hall C bleed through, causing high Compton bg rate | * Junk - run 8072-8080 -- Hall C bleed through, causing high Compton bg rate | ||
− | * Junk - run 8081 -- | + | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8081_000 Run 8081] -- serious Aq feedback problem |
− | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8084_000 Run 8084] -- short run, only ~1k good patterns | + | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8083_000 Run 8083] -- serious Aq feedback problem, short run, only ~1k good patterns |
+ | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8084_000 Run 8084] -- serious Aq feedback problem, short run, only ~1k good patterns | ||
* Junk - run 8087-8090 -- no beam, hall C bleed through | * Junk - run 8087-8090 -- no beam, hall C bleed through | ||
* Junk - run 8092 -- sync loss | * Junk - run 8092 -- sync loss | ||
− | * Junk - run 8098 -- sync problem | + | * Junk - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8098_000 Run 8098] -- sync problem, only 1.5k good patterns |
− | |||
== Issues == | == Issues == |
Latest revision as of 23:30, 30 August 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 28 2020 << >> WAC Notes August 30 2020
August 29 2020
Daily Meeting BlueJeans
Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production
Production Run List - Slug 206 - IHWP OUT - Flip-RIGHT - Production
- Suspecious - Run 8082 -- Aq feedback problem, ~6k good patterns
- Good - Run 8085
- NeedCut - Run 8086 -- bpm12X excursion
- NeedCut - Run 8091 -- bpm12X excursion
- Good - Run 8093
- Good - Run 8094
- Good - Run 8095
- NeedCut - Run 8096 -- bpm12X excursion
Production Run List - Slug 207 - IHWP IN - Flip-RIGHT - Production
- Good - Run 8103
Non-Production Runs and Bad Runs
- Junk - run 8072-8080 -- Hall C bleed through, causing high Compton bg rate
- Junk - Run 8081 -- serious Aq feedback problem
- Junk - Run 8083 -- serious Aq feedback problem, short run, only ~1k good patterns
- Junk - Run 8084 -- serious Aq feedback problem, short run, only ~1k good patterns
- Junk - run 8087-8090 -- no beam, hall C bleed through
- Junk - run 8092 -- sync loss
- Junk - Run 8098 -- sync problem, only 1.5k good patterns