WAC Notes February 24 2020

From PREX Wiki
Revision as of 15:34, 28 March 2020 by Cameronc (Talk | contribs)

Jump to: navigation, search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes February 22 2020 << >> WAC Notes February 25 2020

February 24 2020

Daily Meeting BlueJeans


Production Run List - Slug 142 - IHWP OUT - Flip-LEFT - Production

Start this slug middle of Day shift, February 22 and Complete in the beginning of Swing shift, February 22. Due to LQ1 trip we went to slug143 in between.

Production Run List - Slug 143 - IHWP ??? - Flip-LEFT - Production

INCOMPLETE

Production Run List - Slug 144 - IHWP IN - Flip-LEFT - Production

Start this slug halfway swing shift, February 23

  • Good - Run 6633
  • Good - Run 6636
    • An outlier in bcm_asym (~8000ppm)
  • Good - Run 6637
    • Some energy excursion (~1mm)
  • Good - Run 6638
  • Good - Run 6639
    • LHRS yield started degrading again
  • Good - Run 6644
    • Septum needed to cycle before this run.
    • LHRS energy slope jumped up after the cycle
  • Good - Run 6645
    • ~-5+/-3ppm Aq in minirun3
  • Good - Run 6646
  • Good - Run 6647
    • ~1mm of energy bpm excursion
    • dpp jumped to ~-3e-4 causing ~3mm of less acceptance in quartz.(See https://logbooks.jlab.org/entry/3790948)
    • This caused energy slope increase and width increase during minirun4
    • Applied bad_event_cut for CodaEventNumber(351000:354000)
  • Good - Run 6650
    • MCC sent ~25uA unrastered beam accidentally for about 40sec just before Moller measurements
    • This run was dedicated to test target performance
  • Good - Run 6662
    • BCM widths are slightly larger starting this run
    • When we come back fro Moller measurement, Energy slope, detector widths and yield get worse and remain stable there
  • Good - Run 6663
  • Good - Run 6664

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

Updates