WAC Notes February 25 2020
From PREX Wiki
Revision as of 11:37, 25 February 2020 by Adhidevi (Talk | contribs) (→Production Run List - Slug 145 - IHWP OUT - Flip-LEFT - Production)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 24 2020 << >> WAC Notes February 26 2020
Contents
February 25 2020
Daily Meeting BlueJeans
Production Run List - Slug 145 - IHWP OUT - Flip-LEFT - Production
Start this slug beginning of OWL shift, February 25
- Good - Run 6665
- A jump in BCM yield
- Good - Run 6666
- Good - Run 6667
- Good - Run 6668
- Good - Run 6669
- dpp jump to ~1.7e-4 causing larger energy slope in minirun4 ( See https://logbooks.jlab.org/entry/3791640)
- Good - Run 6670
- Good - Run 6671
- A jump in BCM yield
- Excursion in BPM12X
- Good - Run 6672
- >1mm beam excursion at the end (minirun3)
- Good - Run 6673
- Some ~1mm beam excursion in the beginning
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing