WAC Notes February 5 2020
From PREX Wiki
Revision as of 22:06, 21 April 2020 by Weibin (Talk | contribs) (→Production Run List - Slug 130 - IHWP IN - Flip-RIGHT - Production)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 4 2020 << >> WAC Notes February 6 2020
Contents
February 5 2020
Daily Meeting BlueJeans
Production Run List - Slug 130 - IHWP IN - Flip-RIGHT - Production
continue slug 130 from February 4:
- Good - Run 6211
- Suspicious - Run 6212: FFB is turn off in the last 10 minutes, resulting in huge asym_bcm_an_us_mean, cut it? -- keep it currently
- Good - Run 6213
Production Run List - Slug 131 - IHWP OUT - Flip-RIGHT - Production
- Good - Run 6214 - Some large Aq laser noise, but the DDs look mostly OK, other than doing some up and down during the laser noise... OK
- Good - Run 6215
- Good - Run 6216: an outlier in atl2
- Good - Run 6217
- Good - Run 6218
INCOMPLETE
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- the energy slope value (~35 ppm/um) is still smaller than previous value