WAC Notes January 17 2020

From PREX Wiki
Revision as of 10:58, 26 January 2020 by Cameronc (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 16 2020 << >> WAC Notes January 26 2020

January 17 2020

Daily Meeting BlueJeans

Production Run List - Slug 109 - IHWP OUT - Flip-RIGHT - Production

  • Good - Run 5655 - Cut at 150k-170k to remove beam motion (caused by 120 uA running)
  • Good - Run 5656
  • HELP - Run 5749 - IHWP Slow tree read failure

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • Run 5749 has a cut problem
  • Compton and BMW tuning at 5750 changes things:
    • Moves BPM 1x -3mm
    • Asym widths get wider on Right Arm
    • Slopes of 4eX and 12X change a lot

Counting Mode Downstream Detectors

  • Removed from cuts and correlator channel maps for safety