Difference between revisions of "WAC Notes January 30 2020"

From PREX Wiki
Jump to: navigation, search
(Production Run List - Slug 122 - IHWP ?? - Flip-RIGHT - Production)
(Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production)
Line 22: Line 22:
  
 
=== Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production ===
 
=== Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production ===
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5655_000 Run 5655] - Cut at 150k-170k to remove beam motion (caused by 120 uA running)
 
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Revision as of 12:05, 30 January 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 29 2020 << >> WAC Notes January 31 2020

January 30 2020

Daily Meeting BlueJeans

Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • FFB and orbit locks seem to be breaking, so there is no beam delivery for now

Updates