WAC Notes January 31 2020

From PREX Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 30 2020 << >> WAC Notes February 1 2020

January 31 2020

Daily Meeting BlueJeans


Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production

continue slug 121 from January 29:

Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

start the new slug at ~ 7 am

continue slug 122 on February 1

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

BeamMod Commissioning calibration runs: 6076 - 6084

Issues

  • There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
  • run 6087: after cut, there are still some miniruns with large injector asym in asym_bpm2i01WS, should I cut them out?
  • quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)
  • slug 122: quite large asym. in bpm2i01WS_mean: -7.127 (usually < 5) ppm

Updates