WAC Notes July 21 2019
From PREX Wiki
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << Instructions
WAC Notes July 20 2019 << >> WAC Notes July 22 2019
Contents
July 21 2019
Slug 9/10
- No Right Arm
- Changed to an_ds1 normalizing BCM
- Still working on pedestals
- S0 Out
- IHWP Out 9 - 3520-3541
- IHWP In 10 - 3542-35-
Production Run List Swing 2019-07-20/ Owl 21
- Start Slug 9 on 3520, junk until 3522
- Calibration - [3523]: Aggressive Aq scan
- Calibration/Needs Cuts - [3524]: IA scan
- Good - [3525]:
- Good - [3533]: Halog - End of the long BPM 12 X wandering journey that changed regression slopes
Production Run List Owl 2019-07-21
- Start Slug 10 on 3542, junk 3542
- - [3544]: BPM saturation
- Production - [3545]: BPM saturation resolved
- - [3555]: Perpetually on FFB now
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- Need to update the other BCMs with prior 50 uA pedestals from Caryn