WAC Notes July 21 2019
From PREX Wiki
Jump to navigationJump to searchThe printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << Instructions
WAC Notes July 20 2019 << >> WAC Notes July 22 2019
July 21 2019
Slug 9/10
- No Right Arm
- Changed to an_ds1 normalizing BCM
- Still working on pedestals
- S0 Out
- IHWP Out 9 - 3520-3541
- IHWP In 10 - 3542-35-
Production Run List Swing 2019-07-20/ Owl 21
- Start Slug 9 on 3520, junk until 3522
- Calibration - [3523]: Aggressive Aq scan
- Calibration/Needs Cuts - [3524]: IA scan
- Good - [3525]:
- Good - [3533]: Halog - End of the long BPM 12 X wandering journey that changed regression slopes
Production Run List Owl 2019-07-21
- Start Slug 10 on 3542, junk 3542
- - [3544]: BPM saturation
- Production - [3545]: BPM saturation resolved
- - [3555]: Perpetually on FFB now
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- Need to update the other BCMs with prior 50 uA pedestals from Caryn