Difference between revisions of "WAC Notes July 25 2019"

From PREX Wiki
Jump to: navigation, search
(Production Run List)
(Production Run List)
Line 22: Line 22:
  
 
Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/slug13-Left/y_postPanPlots_slug13-Left.pdf Slug 13, IHWP OUT Flip Right, FFB on always]  
 
Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/slug13-Left/y_postPanPlots_slug13-Left.pdf Slug 13, IHWP OUT Flip Right, FFB on always]  
* Good - [https://hallaweb.jlab.org/parity/prex/onlinePlots/summary/2019-07-25/run####_000/run####_000_all.pdf ####]
+
* Good - [https://hallaweb.jlab.org/parity/prex/onlinePlots/index.php?run=summary/all/run3622_000 run3622]
 +
* Good - [https://hallaweb.jlab.org/parity/prex/onlinePlots/index.php?run=summary/all/run3623_000 run3623]
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Revision as of 20:29, 25 July 2019

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes July 24 2019 << >> WAC Notes July 26 2019

July 25 2019

Production Run List

Start Slug 13, IHWP OUT Flip Right, FFB on always

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed - see japan source code for reference of cuts here
  • The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
  • BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.

Other Status Updates