WAC Notes November 12 2020

From PREX Wiki
Revision as of 15:06, 9 November 2020 by Cameronc (talk | contribs) (→‎Cameron)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
RCDB HALOG HAPLOG DocDB Online Prompt BlueJeans Link Runlist spreadsheet

PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << WAC Post-Run_Meeting Notes

WAC Notes November 5 2020 << >> WAC Notes November 19 2020

Organization

Date and time: November 12, 2020, 11:00am
Bluejeans ID: 454783784
Meeting link: https://bluejeans.com/454783784
Runlist spreadsheet

Suggested Changes

Each WAC will suggest changes for their run period, which will be discussed at this meeting:

Cameron

Beginning of run period 2 - Slug 186

Pedestals:

  • The pedestals were obtained AFTER the run began, so the first set of pedestals (or global pedestals) need to be updated and back-propagated to this run period as well.

Runs:

  • Slug 186 - 7626 - was not included before - is the very first run, it has 5 sigma Aq (no Aq feedback) and FFB commissioning/noise, but otherwise is fine
  • Slug 186 - 7627 - was included before - Has 2 sigma Aq (bad Aq feedback). Also, FFB turning on an off is a mess, but as far as I can tell, there is no negative impact on slopes or corrections (so it should be tolerated)
  • Slug 186 - 7628 - needs cuts - One very brief 1.5 mm 12X jump
  • Slug 186 - 7630 - needs cuts - Another brief 1.5 mm 12X jump
  • Slug 186 - 7631 - needs cuts - Another brief 1.5 mm 12X jump
  • Slug 186 - 7632 - Really huge FFB noise... is it worth keeping the 150um + BPM Y RMS data? X is OK.
  • Slug 186 - 7634 - Really huge FFB noise still
  • Slug 186 - 7635 - BPM 1 YP wire looks fishy, otherwise OK. Some BPM 12X noise, very brief. Same FFB noise problems as before.

Sakib

Weibin

Victoria

Robert

General

  • Need global cuts on ATs