Difference between revisions of "WAC Notes November 6 2019"
From PREX Wiki
(Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...") |
|||
Line 15: | Line 15: | ||
[[Main_Page|<B>PREX Main</B>]] << [[Weekly Analysis Coordinator]] << [[WAC Notes]] << [[WAC|Instructions]] | [[Main_Page|<B>PREX Main</B>]] << [[Weekly Analysis Coordinator]] << [[WAC Notes]] << [[WAC|Instructions]] | ||
<br><br> | <br><br> | ||
− | [[WAC Notes October | + | [[WAC Notes October 30 2019]] << >> [[WAC Notes November 13 2019]] |
− | == | + | == November 6th 2019 == |
'''Daily Meeting [https://bluejeans.com/454783784 BlueJeans]''' | '''Daily Meeting [https://bluejeans.com/454783784 BlueJeans]''' |
Revision as of 12:34, 6 November 2019
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes October 30 2019 << >> WAC Notes November 13 2019
November 6th 2019
Daily Meeting BlueJeans
Agenda
Stuff needed for respin
- List of runs we want to analyze
- We still have 30 slugs that are labeled with "NeedsCut" in Tao's summarized spreadsheet https://docs.google.com/spreadsheets/u/1/d/1Y6qR_h4oW4qNmbtdpo2TIX2u_TI5qjRUZIDyEroMfl0/edit#gid=0 and the updates to RCDB logged here https://github.com/leafybillow/check-list/commit/512908a1a0ba7a1993db7d60c0fde4078b902e48
- At Monday's meeting we set the deadline for the WACs for next Monday (11/11) to have everything fixed.
- Adjusted BCM cuts to be 15uA below nominal
- Robert was going to make a list of the runs that are the transitions between "50uA", "70uA", and "85uA" and give that to Weibin
- Weibin should make a branch off of operations to hold these draft changes
- Fix the pedestal file ranges (and understand big jumps in pedestal values)
- Only change in this respin should be adjustment of run ranges if we applied a pedestal change later than it was intended
- Robert should make a branch off of operations to hold these draft changes
- Any changes in event cuts needed?
- I think at the Monday meeting we decided not to change the other cuts this time through.
- Dither corrections ready to be done for all runs
- Victoria has a list of "blessed slopes" for the whole PREX-II data set. Right now it is in a spreadsheet; she and Paul will discuss how to use this in the respin most easily
Attendance
Phone: