WAC Notes November 6 2019

From PREX Wiki
Revision as of 12:34, 6 November 2019 by Paulmking (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes October 30 2019 << >> WAC Notes November 13 2019

November 6th 2019

Daily Meeting BlueJeans

Agenda

Stuff needed for respin

  • List of runs we want to analyze
  • Adjusted BCM cuts to be 15uA below nominal
    • Robert was going to make a list of the runs that are the transitions between "50uA", "70uA", and "85uA" and give that to Weibin
    • Weibin should make a branch off of operations to hold these draft changes
  • Fix the pedestal file ranges (and understand big jumps in pedestal values)
    • Only change in this respin should be adjustment of run ranges if we applied a pedestal change later than it was intended
    • Robert should make a branch off of operations to hold these draft changes
  • Any changes in event cuts needed?
    • I think at the Monday meeting we decided not to change the other cuts this time through.
  • Dither corrections ready to be done for all runs
    • Victoria has a list of "blessed slopes" for the whole PREX-II data set. Right now it is in a spreadsheet; she and Paul will discuss how to use this in the respin most easily


Attendance

Phone: