WAC Notes September 6 2019

From PREX Wiki
Revision as of 20:14, 6 September 2019 by Weibin (Talk | contribs) (Production Run List - Slug 88)

Jump to: navigation, search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes September 5 2019 << >> WAC Notes September 7 2019

September 6 2019

Daily Meeting BlueJeans

Production Run List - Slug 85

(Wien-left, IHWP-out)

Production Run List - Slug 86

(Wien-left, IHWP-in)

Production Run List - Slug 87

(Wien-left, IHWP-out)

  • Good - 4865
  • Good - 4866 production at 3.3 uA with Compton tuning on
  • Good - 4867
  • Good - 4868


Production Run List - Slug 88

(Wien-left, IHWP-out [still out, change beam tune], new target: D1-208Pb6-D2)

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

Other Status Updates