Difference between revisions of "Weekly Meeting Discussion Topics"
From PREX Wiki
Ciprian Gal (Talk | contribs) |
Ciprian Gal (Talk | contribs) |
||
Line 8: | Line 8: | ||
|- | |- | ||
|Scheduling for PQB time at the end of APEX || CG || - || every 6 weeks || 11/27/2018 || - | |Scheduling for PQB time at the end of APEX || CG || - || every 6 weeks || 11/27/2018 || - | ||
− | |||
− | |||
|- | |- | ||
|Injector setup and feedback || Caryn, Amali || - || every 5 weeks || 12/04/2018 || - | |Injector setup and feedback || Caryn, Amali || - || every 5 weeks || 12/04/2018 || - | ||
Line 31: | Line 29: | ||
|Compton polarimeter || Adam, CG || - || every 4 weeks || 12/18/2018 || - | |Compton polarimeter || Adam, CG || - || every 4 weeks || 12/18/2018 || - | ||
|- | |- | ||
− | |Cavity Beam Monitors || Ye || - || every 6 weeks || | + | |Cavity Beam Monitors || Ye || - || every 6 weeks || 11/27/2019 || - |
|- | |- | ||
− | |Integrating Beam Monitors || CG | + | |Integrating Beam Monitors || CG || - || - || 01/08/2019 || - |
|} | |} |
Revision as of 10:26, 27 November 2018
Back to PREX/CREX_Teleconferences
List of discussion topics
Task | Responsible | Status | Update | Last update | Link |
---|---|---|---|---|---|
Scheduling for PQB time at the end of APEX | CG | - | every 6 weeks | 11/27/2018 | - |
Injector setup and feedback | Caryn, Amali | - | every 5 weeks | 12/04/2018 | - |
Beam modulation | Victoria, Ye | - | every 4 weeks | 12/04/2018 | - |
GEM detectors | Seamus | - | every 4 weeks | 12/04/2018 | - |
Ion chamber positions | CG | - | every 6 weeks | 12/11/2018 | - |
Moller polarimeter | Eric, Sanghwa | - | every 4 weeks | 12/11/2018 | - |
Data Acquisition | Bob | - | every 4 weeks | 12/11/2018 | - |
Tracking and optics | Chandan, Seamus | - | every 4 weeks | 12/11/2018 | - |
Integrating detectors | Dustin | - | every 6 weeks | 12/18/2018 | - |
Analyzer | Paul | - | every 4 weeks | 12/18/2018 | - |
Compton polarimeter | Adam, CG | - | every 4 weeks | 12/18/2018 | - |
Cavity Beam Monitors | Ye | - | every 6 weeks | 11/27/2019 | - |
Integrating Beam Monitors | CG | - | - | 01/08/2019 | - |