List of discussion topics

Task Responsible Status Update Next update Link to updates
Scheduling for PQB time at the end of APEX CG list of tasks is crystalized every 6 weeks 01/08/2019 Nov 27 2018
Injector setup and feedback Caryn, Amali All set for Jan install of RTP every 5 weeks 01/15/2019 Dec 11 2018
Beam modulation Victoria, Ye identified cables, will connect and try to send signal to BSY racks every 4 weeks 02/05/2019 Dec 4 2018, Jan 8 2019
Design status Kent everything on track, deadline for everything to be ready March 11th every 4 weeks 01/15/2019 Dec 4 2018
GEM detectors Dustin, Seamus resources at the lab IDed, every 4 weeks 01/22/2019 Dec 18 2018
Ion chamber positions CG task should be simple. will iterate through simulation every 6 weeks 02/05/2019 Dec 11 2018
Moller polarimeter Eric, Sanghwa, Don comparisons are improving. Bfield inclusion is finished every 4 weeks 01/15/2019 Dec 11 2018
Data Acquisition Bob DAQ upgraded to bank readout. system on track every 4 weeks 01/22/2019 Dec 11 2018
Tracking and optics Chandan, Seamus tracking code needs to be written every 4 weeks 01/22/2019 Dec 18 2018
Integrating detectors Dustin, Devi DAQs setup at JLab, work proceeding on schedule every 6 weeks 02/19/2019 Jan 8 2019
Analyzer Paul several projects being worked on in parallel every 4 weeks 01/29/2019 Dec 18 2018, Jan 29, 2019
Compton polarimeter Adam, Amali, CG opened vacuum and replaced mirrors. will try locking every 4 weeks 01/15/2019 Dec 18 2018
Cavity Beam Monitors Ye limited test done using epics readout, working DAC still pending, updated analysis with HRS scalers every 6 weeks 02/19/2019 Nov 27 2018, Jan 8 2019
Integrating Beam Monitors CG - - 01/08/2019 -