Task | Responsible | Status | Update | Next update | Link to updates |
---|---|---|---|---|---|
Scheduling for PQB time at the end of APEX | CG | list of tasks is crystalized | every 6 weeks | 01/08/2019 | Nov 27 2018 |
Injector setup and feedback | Caryn, Amali | All set for Jan install of RTP | every 5 weeks | 01/15/2019 | Dec 11 2018 |
Beam modulation | Victoria, Ye | identified cables, will connect and try to send signal to BSY racks | every 4 weeks | 02/05/2019 | Dec 4 2018, Jan 8 2019 |
Design status | Kent | everything on track, deadline for everything to be ready March 11th | every 4 weeks | 01/15/2019 | Dec 4 2018 |
GEM detectors | Dustin, Seamus | resources at the lab IDed, | every 4 weeks | 01/22/2019 | Dec 18 2018 |
Ion chamber positions | CG | task should be simple. will iterate through simulation | every 6 weeks | 02/05/2019 | Dec 11 2018 |
Moller polarimeter | Eric, Sanghwa, Don | comparisons are improving. Bfield inclusion is finished | every 4 weeks | 01/15/2019 | Dec 11 2018 |
Data Acquisition | Bob | DAQ upgraded to bank readout. system on track | every 4 weeks | 01/22/2019 | Dec 11 2018 |
Tracking and optics | Chandan, Seamus | tracking code needs to be written | every 4 weeks | 01/22/2019 | Dec 18 2018 |
Integrating detectors | Dustin, Devi | DAQs setup at JLab, work proceeding on schedule | every 6 weeks | 02/19/2019 | Jan 8 2019 |
Analyzer | Paul | several projects being worked on in parallel | every 4 weeks | 01/29/2019 | Dec 18 2018, Jan 29, 2019 |
Compton polarimeter | Adam, Amali, CG | opened vacuum and replaced mirrors. will try locking | every 4 weeks | 01/15/2019 | Dec 18 2018 |
Cavity Beam Monitors | Ye | limited test done using epics readout, working DAC still pending, updated analysis with HRS scalers | every 6 weeks | 02/19/2019 | Nov 27 2018, Jan 8 2019 |
Integrating Beam Monitors | CG | - | - | 01/08/2019 | - |