WAC Notes August 5 2019

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes August 4 2019 << >> WAC Notes August 6 2019

August 5 2019

Daily Meeting BlueJeans

Production Run List

  • Slug 29, Wein_Left, IHWP_IN: continued
    • return to production running mid-Swing shift
    • run 3853-3854: larger MD widths, very large (3X larger) reg Y slopes (hitting target frame?)
    • run3855-3856: good production running, widths and slope now normal
    • slug 29 continues into 06 Aug.

Non-Production Runs and Bad Runs

  • moller and compton studies

Pedestal/Calibrations Updates

Issues

Other Status Updates