Difference between revisions of "Shift Leader"

From PREX Wiki
Jump to navigationJump to search
Line 30: Line 30:
 
* Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the [http://logbooks.jlab.org/book/halla HALOG]. (Make sure to log in.)
 
* Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the [http://logbooks.jlab.org/book/halla HALOG]. (Make sure to log in.)
  
* Keep track of [https://bta/ beam time accounting]
+
* Keep track of [[BTA|beam time accounting]]
** Learn how to keep track of the BTA with the [[BTA|BTA how-to]].
 
  
 
* Consult the [[RC Daily Run Plan]] and communicate with [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=PREX/CREX run coordinator] whenever problems happen that cannot be solved by shift workers.
 
* Consult the [[RC Daily Run Plan]] and communicate with [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=PREX/CREX run coordinator] whenever problems happen that cannot be solved by shift workers.
Line 39: Line 38:
 
* Follow the directives in the [http://hallaweb.jlab.org/index/safety-docs/current/ COO!]
 
* Follow the directives in the [http://hallaweb.jlab.org/index/safety-docs/current/ COO!]
  
* Log the following in a shift summary in the [http://logbooks.jlab.org/book/halla HALOG]:
+
* Log the following in an end of shift summary in the [http://logbooks.jlab.org/book/halla HALOG]:
 
** run list (describing the goal of this run: eg production on Pb, BCM calibration...) and report main statistic numbers
 
** run list (describing the goal of this run: eg production on Pb, BCM calibration...) and report main statistic numbers
 
** any major events, including hall access
 
** any major events, including hall access
*Post Snapshots with HALOG of important information at <B> least </B> twice a shift.  
+
* Post Snapshots with HALOG of important information at <B> least </B> twice a shift.  
 
** Include- Hall A tools, BPM strip-charts, and BCM strip-charts.
 
** Include- Hall A tools, BPM strip-charts, and BCM strip-charts.
** Include any snapshots of the details after a change.
+
** Include any snapshots of the details after a change
** Please feel free to post these Snapshots more often.
+
** Please feel free to post these Snapshots more often
*Complete the Shift check list!
+
* Complete the [[Shift Checklist]]
**Link to [[HOW TOs]] and link to [https://logbooks.jlab.org/checklists/293 online] copy of the list.
 

Revision as of 16:35, 8 June 2019

Quick Links
Experts on call
Hall A Tools
Set HRS magnets
Online analysis How-To
Starting CODA
Trouble-shooting the High Voltage GUI
BTA how-to
Full HOW TOs

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< Information for Shift Takers


Shift Leader Responsibilities

  • Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the HALOG. (Make sure to log in.)
  • Maintain data taking quality and an efficient use of beam time.
  • Follow the directives in the COO!
  • Log the following in an end of shift summary in the HALOG:
    • run list (describing the goal of this run: eg production on Pb, BCM calibration...) and report main statistic numbers
    • any major events, including hall access
  • Post Snapshots with HALOG of important information at least twice a shift.
    • Include- Hall A tools, BPM strip-charts, and BCM strip-charts.
    • Include any snapshots of the details after a change
    • Please feel free to post these Snapshots more often
  • Complete the Shift Checklist