Shift Leader
From PREX Wiki
Jump to navigationJump to searchQuick Links |
Experts on call |
Hall A Tools |
Set HRS magnets |
Online analysis How-To |
Using CODA |
Trouble-shooting the High Voltage GUI |
BTA how-to |
Shift Checklist Instructions |
Full HOW TOs |
PREX Main<< Information for Shift Takers
Useful links
Shift Leader Responsibilities
- Calculate ABU's when in production mode by counting good Coulombs per run: 150uA each hour = 0.54C. 1hour runs. For each hour long run(s) take #good-Coulombs/0.54C = #ABU's (even when running at a lower current, obsolete method: https://logbooks.jlab.org/entry/3785102)
- Communicate clearly and effectively with shift crews and MCC (7047)
- arrive ~10 min. early to your shift to talk with the previous shift crew
- Answer the phone
- Communicate with the RC
- Consult the Daily Run Plan and contact the run coordinator whenever problems happen that cannot be solved by shift workers
- Log any status information to the HALOG (Make sure to log in!)
- Maintain data taking quality and efficient use of beam time
- Use Panguin to evaluate data quality
- Post Snapshots with HALOG of important information at least twice a shift.
- Include- Hall A tools, BPM strip-charts, and BCM strip-charts.
- Include any snapshots of the details after a change
- Please feel free to post these Snapshots more often
- Sample screenshots to make during shifts (examples below during no-beam conditions, purely descriptive): collimator temp, Compton ion chambers, bpms, vacuums, parity controls, FFB, raster, ioc chamber
- Collimator and Beamline temperatures
- Hall A Beamline monitors, and Compton and Moller magnets, and bleedthrough check - useful for evaluating beam set up and tune
- Ion Chambers
- FFB system - these examples show the system while inactive - check a more recent log entry with active FFB for a prescriptive example
- Hall A Raster
- Hall A Tools, magnets
- Hall A Target status
- Scaler GUI
- Injector Loss Monitor - useful for diagnosing large Aq widths and noise problems
- Charge Feedback Monitor
- Compton
- Target motion and mask
- Beamline Vacuum
- Parity Controls
- Keep track of beam time accounting
- Follow the directives in the COO!
- Log the following in an end of shift summary in the HALOG:
- run list (describing the goal of this run: eg production on Pb, BCM calibration...) and report main statistic numbers
- any major events, including hall access (in addition to making log entries when they happen)
- Complete the Shift Checklist at the beginning of the shift - see Instructions
- Note: There is a convenient script in ~/cameronc/SL/auto-SL.sh which will walk you through the steps of the shift checklist and provide easily copyable text-outputs for easy entry into the checklist and comparison with expectations
- Print off additional run sheets (printer "chax"): https://logbooks.jlab.org/entry/3700479
- A PREX analysis shift worker will be on hand for most shifts (although not required by the COO) to help out in high demand situations. Please coordinate with them as well.
- Read Common Problems for information on how to deal with common issues cropping up