Difference between revisions of "TL-Docs"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "'''Contact''': ?? ''Manpower'': ?? __FORCETOC__ == Run planning == * Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation) * Comprehensiv...") |
Kent Paschke (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | [[Task-List-Landing | Main Task List]] | |
− | ''Manpower'': | + | '''Contact''': Bob Michaels |
+ | |||
+ | ''Manpower'': Bob Michaels, + all as needed | ||
__FORCETOC__ | __FORCETOC__ | ||
Line 14: | Line 16: | ||
==Formal== | ==Formal== | ||
* Finalize OSPs (ERR recommendation) | * Finalize OSPs (ERR recommendation) | ||
+ | |||
+ | ==Shift and Analysis Documentation== | ||
+ | * shift How-to's | ||
+ | * Analysis how-to's |
Latest revision as of 21:20, 14 March 2018
Contact: Bob Michaels
Manpower: Bob Michaels, + all as needed
Run planning
- Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation)
- Comprehensive List / Planning for survey and alignment tasks
- Watercell (pointing) runplan
- optics runplan
- detector alignment run plan
Formal
- Finalize OSPs (ERR recommendation)
Shift and Analysis Documentation
- shift How-to's
- Analysis how-to's