TL-Docs
From PREX Wiki
Jump to navigationJump to searchContact: Bob Michaels
Manpower: Bob Michaels, + all as needed
Run planning
- Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation)
- Comprehensive List / Planning for survey and alignment tasks
- Watercell (pointing) runplan
- optics runplan
- detector alignment run plan
Formal
- Finalize OSPs (ERR recommendation)
Shift and Analysis Documentation
- shift How-to's
- Analysis how-to's