Difference between revisions of "Run plan history"
From PREX Wiki
Jump to navigationJump to search(17 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
− | + | ||
<br><br> | <br><br> | ||
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] << [[RunPlanDaily]] <br><br> | [[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] << [[RunPlanDaily]] <br><br> | ||
− | Copy weekly run plan tables here | + | Copy weekly run plan tables here. |
Line 124: | Line 124: | ||
| No beam. | | No beam. | ||
|- | |- | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, June 25 | ||
+ | | Owl | ||
+ | | | ||
+ | | No beam. shift cancelled. | ||
+ | |- | ||
+ | | Day | ||
+ | | Target cooling down. | ||
+ | | shift cancelled | ||
+ | |- | ||
+ | | Swing | ||
+ | | Optics. | ||
+ | | Vacuum issue. No beam for the whole shift. | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, June 26 | ||
+ | | Owl | ||
+ | | Optics. | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Optics. Send beam through Compton chicane. | ||
+ | | Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened. | ||
+ | |- | ||
+ | | Swing | ||
+ | | Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. | ||
+ | | Cavity lock commissioning completed | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, June 27 | ||
+ | | Owl | ||
+ | | Optics (db scan), Q2 measurement, detector alignment | ||
+ | | db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon | ||
+ | |- | ||
+ | | Day | ||
+ | | Send beam through Compton chicane, Compton commissioning. | ||
+ | | Fail to send beam through compton chicane | ||
+ | |- | ||
+ | | Swing | ||
+ | | Rate scan (Dustin) and SAM shutter test, raster size verification | ||
+ | | All completed | ||
+ | |- | ||
+ | | rowspan="3" | Friday, June 28 | ||
+ | | Owl | ||
+ | | Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-() | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Compton commissioning, current + PITA scan, finish up high current test, BMW | ||
+ | | Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB. | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, June 29 | ||
+ | | Owl | ||
+ | |Production (natural Pb, Carbon) | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | Day | ||
+ | | Production with 208Pb? Rate studies, Phase 1. | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | Swing | ||
+ | | Sweep + access. Phase 2 rate studies | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, June 30 | ||
+ | | Owl | ||
+ | | 208Pb Production. Target Fleet Commissioning | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller commissioning. | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | Swing | ||
+ | | Optics - Y target finding, Bandwidth. Collimator heating axis study. | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | rowspan="3" | Monday, July 1 | ||
+ | | Owl | ||
+ | | | ||
+ | | Down due to target vacuum problem | ||
+ | |- | ||
+ | | Day | ||
+ | | Beam Studies | ||
+ | | Target vacuum leak source found, recovery in progress | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | Site power loss while ramping up HRS magnets after target cool down | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, July 2 | ||
+ | | Owl | ||
+ | | | ||
+ | | Down due to the site power loss, https://logbooks.jlab.org/entry/3697845 | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | Down due to the site power loss | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | Down due to the site power loss | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, July 3 | ||
+ | | Owl | ||
+ | | | ||
+ | | Down due to the site power loss | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon <br> Currently we are: <br> Sieve OUT <br> Integrating mode detector <br> Raster off (tested ok yesterday) <br> Cavity in low current mode | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, July 4 | ||
+ | | Owl | ||
+ | | | ||
+ | | Restricted | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | Restricted | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | Restricted | ||
+ | |- | ||
+ | | rowspan="3" | Friday, July 5 | ||
+ | | Owl | ||
+ | | | ||
+ | | Restricted | ||
+ | |- | ||
+ | | Day | ||
+ | | Target cool down, Magnet ramp up | ||
+ | | Restricted->Controlled access | ||
+ | |- | ||
+ | | Swing | ||
+ | | Cold target monitoring, Magnet ramp up | ||
+ | | Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, July 6 | ||
+ | | Owl | ||
+ | | Cold target monitoring. | ||
+ | | Power outage in SL, no beam | ||
+ | |- | ||
+ | | Day | ||
+ | | Got 70uA to dump, then Cold target monitoring. | ||
+ | | 8am - 5S optics, tune B after 5S | ||
+ | |- | ||
+ | | Swing | ||
+ | | Cold target monitoring. | ||
+ | | Tuned accelerator, took beam away, 5S optics, tune B after 5S | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, July 7 | ||
+ | |Owl | ||
+ | | Cold target monitoring. | ||
+ | | Tuned accelerator, took beam away, 5S optics, tune B after 5S | ||
+ | |- | ||
+ | |Day | ||
+ | | low current cav commissioning (for EPICS) and beamline optics | ||
+ | | Tuned C, then tune beam to A, then 20nA CW, then back taken for retuning | ||
+ | |- | ||
+ | |Swing | ||
+ | | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]] | ||
+ | | tuning for most of shift, hope for Production CW | ||
+ | |- | ||
+ | | rowspan="3" | Monday, July 8 | ||
+ | |Owl | ||
+ | | no beam | ||
+ | | | ||
+ | |- | ||
+ | |Day | ||
+ | |High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]] | ||
+ | |Production CW , | ||
+ | |- | ||
+ | |Swing | ||
+ | |High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]] | ||
+ | |Production CW | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, July 9 | ||
+ | |Owl | ||
+ | | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]] | ||
+ | | Parasitic CW , tuning for higher passes | ||
+ | |- | ||
+ | |Day | ||
+ | | Low current, different triggers on C, Pb | ||
+ | | Parasitic CW , tuning for higher passes | ||
+ | |- | ||
+ | |Swing | ||
+ | |Low current GEMS,Sieve/switch to integrating (and remove S0?) | ||
+ | |Parasitic CW , tuning for higher passes | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, July 10 | ||
+ | |Owl | ||
+ | | Detector alignment and low current counting mode | ||
+ | |CW low current | ||
+ | |- | ||
+ | | Day | ||
+ | | High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]] | ||
+ | | 50uA | ||
+ | |- | ||
+ | | Swing | ||
+ | | Moller commissioning | ||
+ | | <2uA | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, July 11 | ||
+ | |Owl | ||
+ | |Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on) | ||
+ | |Experts are looking at data, FFB was not working | ||
+ | |- | ||
+ | | Day | ||
+ | | Hysteresis recovery, machine retuning | ||
+ | | Hysteresis recovery done, no beam in the hall. | ||
+ | |- | ||
+ | | Swing | ||
+ | | No beam in the hall | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Friday, July 12 | ||
+ | |Owl | ||
+ | |Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies | ||
+ | |No beam in the hall | ||
+ | |- | ||
+ | | Day | ||
+ | | Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian) | ||
+ | | No beam in the hall | ||
+ | |- | ||
+ | | Swing | ||
+ | | Try FFB and 208Pb production. | ||
+ | | No beam in the hall | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, July 13 | ||
+ | |Owl | ||
+ | |Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). | ||
+ | | no beam in the hall | ||
+ | |- | ||
+ | | Day | ||
+ | | Continue with owl shift plan. | ||
+ | | No beam | ||
+ | |- | ||
+ | | Swing | ||
+ | | Continue with today's owl shift plan | ||
+ | | got beam ~8 pm. Checked raster size and started production data taking without FFB | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, July 14 | ||
+ | |Owl | ||
+ | | Production+ analysis. FFB (30 min), BMW (30 min), Aq | ||
+ | | FFB tried, but didn't work. | ||
+ | |- | ||
+ | | Day | ||
+ | | Production+ analysis | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production+ analysis | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Monday, July 15 | ||
+ | |Owl | ||
+ | | Production+ analysis. | ||
+ | | Except ~3 hour down time, we took good data | ||
+ | |- | ||
+ | | Day | ||
+ | | FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. | ||
+ | | MOLLER polarimeter commissioning is going on | ||
+ | |- | ||
+ | | Swing | ||
+ | |MOLLER commissioning | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, July 16 | ||
+ | |Owl | ||
+ | |MOLLER Polarimeter and FFB commissioning | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | production after pass change | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | |change IHWP ('out'), BPM and BCM calibration (Caryn) | ||
+ | |Done | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, July 17 | ||
+ | |Owl | ||
+ | |Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | HallB tuning no beam and frame hunting I | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | |frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, July 18 | ||
+ | |Owl | ||
+ | |IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | 50 microAmp production, PQB study, FFB test | ||
+ | | full survey to solve the RHRS Q2 | ||
+ | |- | ||
+ | | Swing | ||
+ | |Moller measurement | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Friday, July 19 | ||
+ | |Owl | ||
+ | |Moller measurement | ||
+ | |ready for the spin dance, may need short measurement to be complete. | ||
+ | |- | ||
+ | | Day | ||
+ | |control access for the RHRS Q2 magnet tripping | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | |Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, July 20 | ||
+ | |Owl | ||
+ | |production at 50uA | ||
+ | |RHRS Q2 magnet is down | ||
+ | |- | ||
+ | | Day | ||
+ | |control access for Q2 debugging | ||
+ | |beam stop at 8:00am and back at 4:00pm | ||
+ | |- | ||
+ | | Swing | ||
+ | |PITA/IA scan at 50uA, production at 50uA | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, July 21 | ||
+ | |Owl | ||
+ | |production at 50uA | ||
+ | |RHRS Q2 magnet is down | ||
+ | |- | ||
+ | | Day | ||
+ | |production at 50uA | ||
+ | | RHRS Q2 magnet is down | ||
+ | |- | ||
+ | | Swing | ||
+ | | Qsqr measurement and production at 50uA | ||
+ | | RHRS Q2 magnet is down | ||
+ | |- | ||
+ | |- | ||
+ | | rowspan="3" | Monday, July 22 | ||
+ | |Owl | ||
+ | |production at 50uA, Moller measurement was paused | ||
+ | |LCW leak in the west arc | ||
+ | |- | ||
+ | | Day | ||
+ | |control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode | ||
+ | |LCW leak >10 hours | ||
+ | |- | ||
+ | | Swing | ||
+ | | Qsq measurement, Detector alignment at low current. | ||
+ | |1 hour | ||
+ | |- | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, July 23 | ||
+ | |Owl | ||
+ | |No beam due to LCW leak | ||
+ | |>30h | ||
+ | |- | ||
+ | | Day | ||
+ | |control access for Q2 magnet, Compton laser work | ||
+ | |Q2 is recovered around 12:00pm | ||
+ | |- | ||
+ | | Swing | ||
+ | | No acceptable beam | ||
+ | |1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, July 24 | ||
+ | |Owl | ||
+ | |No acceptable beam until 6:30am | ||
+ | |Dump puck | ||
+ | |- | ||
+ | | Day | ||
+ | |Moller and Spin dance measurement | ||
+ | | Success!! Final Wien -13.3 | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | # [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]] | ||
+ | # Low current: detector alignment (Devi, Kent, Dustin) | ||
+ | # Qsq measurement (Bob) | ||
+ | # Short access to go to integrating mode (Devi) | ||
+ | # SAM HV adjustment (Devi) | ||
+ | # Current scan (75 - 5 uA), PITA scan (Caryn) | ||
+ | # 30 minute PROD run at 50uA to check widths | ||
+ | # Production at 70uA | ||
+ | | Short access for changing the cable to integrate mode and changing the Compton attenuator | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, July 25 | ||
+ | |Owl | ||
+ | |production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Planned: | ||
+ | #* production at 70uA | ||
+ | #* ~30 minutes for injector bias tests during Hall C gas work (Caryn) | ||
+ | # Unplanned: | ||
+ | #* Access to fix the BPMs/ move away from beamline (Francis) | ||
+ | #* Need to fix the BCMs (Musson) | ||
+ | | BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | # [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]] | ||
+ | # production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Friday, July 26 | ||
+ | |Owl | ||
+ | |production at 70uA | ||
+ | | deltaT on the collimator increased. Water out temp exceeding our set limits | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # production at 70uA | ||
+ | # Brief access to swap the digital receiver when Musson and Co. ready | ||
+ | # Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?) | ||
+ | | receiver swapped; DO NOT MOVE THE TARGET! | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | # production at 70uA | ||
+ | # special spot run with VDCs (Kent) | ||
+ | # careful collimator temperature study (Kent) | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, July 27 | ||
+ | |Owl | ||
+ | |production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | |production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, July 28 | ||
+ | |Owl | ||
+ | |production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | # spot++ to assess the target | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Monday, July 29 | ||
+ | |Owl | ||
+ | |production at 70uA; DO NOT MOVE THE TARGET! | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | *low current running (expert driven, if approved) | ||
+ | *# bandwidth study | ||
+ | *# MOLLER test | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | *low current running (expert driven) | ||
+ | *# MOLLER test | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, July 30 | ||
+ | |Owl | ||
+ | |low current running beginning at 8am (if approved) | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Target fix | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | * Tests with no target | ||
+ | # collimator centering angles with tune beam | ||
+ | # BCM calibrations | ||
+ | # BPM calibrations | ||
+ | # position feedback study | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, July 31 | ||
+ | |Owl | ||
+ | |production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # HRS quad repairs | ||
+ | # target repairs | ||
+ | # Compton work | ||
+ | # BCM repair | ||
+ | | | ||
+ | # HRS quad repairs - both operational; nothing really done to right | ||
+ | # target repairs - mechanical work done, modifying software for new setpoints | ||
+ | # Compton work ongoing | ||
+ | # 2nd one working as well as we can tell | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | # Raster check | ||
+ | # Detector alignment (low current) | ||
+ | #* Main detectors | ||
+ | #* AT detectors | ||
+ | # BCM test and Current and Pita scans | ||
+ | # production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, August 1 | ||
+ | | Owl | ||
+ | | production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | production at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | |- | ||
+ | | rowspan="3" | Friday, August 2 | ||
+ | |Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Wien flip starting at 8:30am | ||
+ | # Compton work in the hall: lens, mode-matching, PPLN tuning | ||
+ | #Production 70uA; (IHWP OUT, start slug 26) | ||
+ | |raster changed to 4 x 5 mm2 for slug 26 | ||
+ | |- | ||
+ | | Swing | ||
+ | |Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, August 3 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Address issues-- Col. temps, and increased det. widths | ||
+ | #Production running at 70uA | ||
+ | | changed to Pb9 target | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, August 4 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller starting at 8am | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | more Moller | ||
+ | |- | ||
+ | | rowspan="3" | Monday, August 5 | ||
+ | | Owl | ||
+ | | more Moller | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Compton work in Hall | ||
+ | #Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, August 6 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Production until 10:30 am | ||
+ | #Controlled access for Compton work | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, August 7 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Production running at 70uA | ||
+ | # Compton Chicane tuning; | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, August 8 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | #Production running at 70uA | ||
+ | # Production until 9:00 am | ||
+ | # No beam during Hall C witness beam setup and injector anode-bias remove | ||
+ | # Production running at 70uA | ||
+ | # <s>Moller solenoid axis and lock</s> | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Friday, August 9 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Production running at 70uA | ||
+ | # Hall Access | ||
+ | # Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, August 10 | ||
+ | | Owl | ||
+ | | | ||
+ | # Production running at 70uA until 6:30 am | ||
+ | # Ask to save the Compton-Chicane tune configuration | ||
+ | # Request for Compton Straight-Through beam | ||
+ | # Take production at 70 uA until Moller crew arive | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Moller measurement | ||
+ | # Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | # Moller measurement | ||
+ | # <s>Production running at 70uA</s> | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, August 11 | ||
+ | | Owl | ||
+ | | | ||
+ | # Request Compton Straight-Through tune | ||
+ | # Production running at 70uA with Compton Straight-Through beam | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | |- | ||
+ | | rowspan="3" | Monday, August 12 | ||
+ | | Owl | ||
+ | | Production running at 70uA with | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Production running at 70uA | ||
+ | # Commissioning targets required for Transverse measurements include raster size calibrations | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, August 13 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Planned accelerator downtime:Beam studies | ||
+ | # Preparations for Transverse Polarized Measurement | ||
+ | |- | ||
+ | | Swing | ||
+ | | Transverse Polarized Measurement | ||
+ | | roduction running until beam was taken away for Hall B. | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, August 14 | ||
+ | | Owl | ||
+ | | Transverse Polarized Measurement | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Transverse Polarized Measurement | ||
+ | # Wein Flip back to `Right' | ||
+ | | | ||
+ | # Transverse work done at ~10:30. | ||
+ | # Hand things off to OPS for beam studies and Wien flip. | ||
+ | |-Cornejo | ||
+ | | Swing | ||
+ | # Establish PQB after Wien flip | ||
+ | # PITA scan | ||
+ | | Production running at 70uAroduction running until beam was taken away for Hall B. | ||
+ | | | ||
+ | # Caryn checks PQB (at ILD). Done by ~16:30 | ||
+ | # PITA scan ~18:45 | ||
+ | # Moved to D5-208Pb8-D6 target ~20:45 | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, August 15 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | # Target out for Compton background studies | ||
+ | # Production back on Pb#8 | ||
+ | |- | ||
+ | | rowspan="3" | Friday, August 16 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | Beam off at 7 AM to cool down the hall prior to Compton work | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | # Work in the hall for to replace Compton fiber amp | ||
+ | # Jessie will work on Tungsten Collimator flow reedback issue | ||
+ | | | ||
+ | # Jack added additional shielding around the hall | ||
+ | # Dave, Amali and Caryn worked on the laser | ||
+ | # CHL problems starting at 12:03 means no opportunity of beam during shift | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | No beam due to CHL and Hall B restore | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, August 17 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | No beam due to CHL and Hall B restore | ||
+ | |- | ||
+ | | Day | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | # Beam returns around 8:30 AM | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | Garrett | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, August 18 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller measurement | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | # Moller measurement concluded | ||
+ | # 70 uA beam restored to hall | ||
+ | # Production running | ||
+ | |- | ||
+ | | rowspan="3" | Monday, August 19 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, August 20 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, August 21 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller | ||
+ | | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. | ||
+ | |- | ||
+ | | Swing | ||
+ | | Q2 measurement | ||
+ | | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. | ||
+ | |- | ||
+ | | rowspan="3" | Thursday, August 22 | ||
+ | | Owl | ||
+ | | Production running at 70uA | ||
+ | | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. | ||
+ | |- | ||
+ | | Day | ||
+ | | Wien flip | ||
+ | | Beam taken away at 8:30. Mott measurements before Wien flip. <br> MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. | ||
+ | |- | ||
+ | | Swing | ||
+ | | Wien flip and beam restoration | ||
+ | | Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check. | ||
+ | |- | ||
+ | | rowspan="3" | Friday, August 23 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through.<br> | ||
+ | |- | ||
+ | | Day | ||
+ | | Production, 70uA | ||
+ | | Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune. | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz) | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, August 24 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production, 70uA | ||
+ | | Beam taken away for Hall B tuning around noon. 6.5hours of total downtime.<br> opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset. | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | Beam back at 6pm. Steady production running since then. | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, August 25 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production, 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production running at 70uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Monday, August 26 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production, 70uA | ||
+ | | No compton, got straight through beam | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, August 27 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | No compton, got straight through beam | ||
+ | |- | ||
+ | | Day | ||
+ | | Compton tuning | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production 71uA<br>Energy measurement | ||
+ | | Parasitic energy measurement during production (not completed) | ||
+ | |- | ||
+ | | rowspan="3" | Wednesday, August 28 | ||
+ | | Owl | ||
+ | | Production 70uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Stubby quatz; blinding study | ||
+ | | completed | ||
+ | |- | ||
+ | | Swing | ||
+ | | Stubby quatz; blinding study; recovery | ||
+ | | completed; recovery took until 2AM. Seen increased widths with 1C19/1C20 10% increase | ||
+ | |-style="background: #FCF3CF; | ||
+ | | rowspan="3" | Thursday, August 29 | ||
+ | | Owl | ||
+ | | Production, 70uA | ||
+ | | No compton, got straight through beam | ||
+ | |-style="background: #FCF3CF; | ||
+ | | Day | ||
+ | | Compton tuning + Main Exp tuning; | ||
+ | | completed intrinsic spot size adjustments by 4 15; | ||
+ | |-style="background: #FCF3CF; | ||
+ | | Swing | ||
+ | | Main experiment width test. Test S0 integrity with short low current run. Pole tip re-scattering | ||
+ | | width test showed problems with the dithering sensitivity; S0 test could not be done because LHRS regulator was broken; Pole tip rescattering data taking went well (sieve runs were only with the left arm). | ||
+ | |- | ||
+ | | rowspan="3" | Friday, August 30 | ||
+ | | Owl | ||
+ | | Aux msmts and try different 1H01/1H04 settings to see if they provide changes in sensitivities | ||
+ | | this was done with poor sensitivities on dithering and L arm only | ||
+ | |- | ||
+ | | Day | ||
+ | | Access to address R arm | ||
+ | | plan developed to address dithering | ||
+ | |- | ||
+ | | Swing | ||
+ | | Access wrapped up by 8 pm; implementation of Todd's phase telescope | ||
+ | | phase telescope didn't provide the needed sensitivities but proved that we can indeed reconfigure quads to impact sensitivities | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, August 31 | ||
+ | | Owl | ||
+ | | Production 71uA | ||
+ | | still with poor sensitivities | ||
+ | |- | ||
+ | | Day | ||
+ | | Moller | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Moller | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Sunday, September 1 | ||
+ | | Owl | ||
+ | | Optics | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Optics wrap up by 11 AM (including preli tgt density study); access to blind ATs and take them out of counting mode; Attempt beam restore through Compton | ||
+ | | first settings didn't provide a good solution but clear path | ||
+ | |- | ||
+ | | Swing | ||
+ | | recovered sensitivities; good Compton rates; back to production | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Monday, September 1 | ||
+ | | Owl | ||
+ | | Production 71uA | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production 71uA | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Production 71uA | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Tuesday, September 3 | ||
+ | | Owl | ||
+ | | Production 71uA; further 1h tgt density study | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | Production 71uA; injector prebuncher checks; | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | Q2; Production 71uA | ||
+ | | | ||
|} | |} |
Latest revision as of 12:46, 8 September 2019
PREX Main << Run Coordinator Tools << RunPlanDaily
Copy weekly run plan tables here.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Friday, June 14 | Owl | ||
Day | |||
Swing | |||
Monday, June 17 | Owl | ||
Day | Last day for planned collaboration work in Hall. | Expecting 2A alignment | |
Swing | Vacuum connections between US pipe and target and between target and collimator box. | ||
Tuesday, June 18 | Owl | ||
Day | Pump down the entire pivot to dump region; Expecting 2B alignment | ||
Swing | Target software checks | ||
Wednesday, June 19 | Owl | ||
Day | Hall Closed. Final Checklist. Possible first beam in Hall A | ||
Swing | Continue beam in Hall A for tuning. Start low beam checkout. | ||
Thursday, June 20 | Owl | Continue low beam current checkout. | Completed Collimator search. |
Day | Tuning | ||
Swing | Tune up and Low current commissioning. | ||
Friday, June 21 | Owl | Low current commissioning. Started optics | Commissioned 45deg and 90deg targets. Calibrated ion chambers. Bullseye scan. |
Day | High current + Compton rate tuning. | ||
Swing | High current calibration after tuning (Caryn). Low current commissioning. Restart Optics (Seamus, Sanghwa, Ryan) | Basic run quality plot macro needed (Sanghwa). | |
Saturday, June 22 | Owl | Opportunistic: Beam Modulation (Paul K, Vectoria) | ESR 15K helium issue, scattering chamber vacuum degration investigation |
Day | Optics. | ||
Swing | Low current cavity (Ye, Cip). Minimum chase. | ||
Sunday, June 23 | Owl | Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | Inner edge search DONE. |
Day | Minimize width. | ||
Swing | Minimize width. Minimum chase. | ||
Monday, June 24 | Owl | Quartz align; quartz rate. (Dustin) | |
Day | Optics verification. | ESR 15K helium repair is ongoing. | |
Swing | No beam. | ||
Tuesday, June 25 | Owl | No beam. shift cancelled. | |
Day | Target cooling down. | shift cancelled | |
Swing | Optics. | Vacuum issue. No beam for the whole shift. | |
Wednesday, June 26 | Owl | Optics. | |
Day | Optics. Send beam through Compton chicane. | Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened. | |
Swing | Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. | Cavity lock commissioning completed | |
Thursday, June 27 | Owl | Optics (db scan), Q2 measurement, detector alignment | db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon |
Day | Send beam through Compton chicane, Compton commissioning. | Fail to send beam through compton chicane | |
Swing | Rate scan (Dustin) and SAM shutter test, raster size verification | All completed | |
Friday, June 28 | Owl | Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-() | |
Day | Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning | ||
Swing | Compton commissioning, current + PITA scan, finish up high current test, BMW | Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB. | |
Saturday, June 29 | Owl | Production (natural Pb, Carbon) | Down due to target vacuum problem |
Day | Production with 208Pb? Rate studies, Phase 1. | Down due to target vacuum problem | |
Swing | Sweep + access. Phase 2 rate studies | Down due to target vacuum problem | |
Sunday, June 30 | Owl | 208Pb Production. Target Fleet Commissioning | Down due to target vacuum problem |
Day | Moller commissioning. | Down due to target vacuum problem | |
Swing | Optics - Y target finding, Bandwidth. Collimator heating axis study. | Down due to target vacuum problem | |
Monday, July 1 | Owl | Down due to target vacuum problem | |
Day | Beam Studies | Target vacuum leak source found, recovery in progress | |
Swing | Site power loss while ramping up HRS magnets after target cool down | ||
Tuesday, July 2 | Owl | Down due to the site power loss, https://logbooks.jlab.org/entry/3697845 | |
Day | Down due to the site power loss | ||
Swing | Down due to the site power loss | ||
Wednesday, July 3 | Owl | Down due to the site power loss | |
Day | Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon Currently we are: Sieve OUT Integrating mode detector Raster off (tested ok yesterday) Cavity in low current mode | ||
Swing | |||
Thursday, July 4 | Owl | Restricted | |
Day | Restricted | ||
Swing | Restricted | ||
Friday, July 5 | Owl | Restricted | |
Day | Target cool down, Magnet ramp up | Restricted->Controlled access | |
Swing | Cold target monitoring, Magnet ramp up | Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL | |
Saturday, July 6 | Owl | Cold target monitoring. | Power outage in SL, no beam |
Day | Got 70uA to dump, then Cold target monitoring. | 8am - 5S optics, tune B after 5S | |
Swing | Cold target monitoring. | Tuned accelerator, took beam away, 5S optics, tune B after 5S | |
Sunday, July 7 | Owl | Cold target monitoring. | Tuned accelerator, took beam away, 5S optics, tune B after 5S |
Day | low current cav commissioning (for EPICS) and beamline optics | Tuned C, then tune beam to A, then 20nA CW, then back taken for retuning | |
Swing | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | tuning for most of shift, hope for Production CW | |
Monday, July 8 | Owl | no beam | |
Day | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Production CW , | |
Swing | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Production CW | |
Tuesday, July 9 | Owl | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Parasitic CW , tuning for higher passes |
Day | Low current, different triggers on C, Pb | Parasitic CW , tuning for higher passes | |
Swing | Low current GEMS,Sieve/switch to integrating (and remove S0?) | Parasitic CW , tuning for higher passes | |
Wednesday, July 10 | Owl | Detector alignment and low current counting mode | CW low current |
Day | High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan Detailed plan | 50uA | |
Swing | Moller commissioning | <2uA | |
Thursday, July 11 | Owl | Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on) | Experts are looking at data, FFB was not working |
Day | Hysteresis recovery, machine retuning | Hysteresis recovery done, no beam in the hall. | |
Swing | No beam in the hall | ||
Friday, July 12 | Owl | Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies | No beam in the hall |
Day | Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian) | No beam in the hall | |
Swing | Try FFB and 208Pb production. | No beam in the hall | |
Saturday, July 13 | Owl | Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). | no beam in the hall |
Day | Continue with owl shift plan. | No beam | |
Swing | Continue with today's owl shift plan | got beam ~8 pm. Checked raster size and started production data taking without FFB | |
Sunday, July 14 | Owl | Production+ analysis. FFB (30 min), BMW (30 min), Aq | FFB tried, but didn't work. |
Day | Production+ analysis | ||
Swing | Production+ analysis | ||
Monday, July 15 | Owl | Production+ analysis. | Except ~3 hour down time, we took good data |
Day | FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. | MOLLER polarimeter commissioning is going on | |
Swing | MOLLER commissioning | ||
Tuesday, July 16 | Owl | MOLLER Polarimeter and FFB commissioning | |
Day | production after pass change | ||
Swing | change IHWP ('out'), BPM and BCM calibration (Caryn) | Done | |
Wednesday, July 17 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | HallB tuning no beam and frame hunting I | ||
Swing | frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster | ||
Thursday, July 18 | Owl | IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off | |
Day | 50 microAmp production, PQB study, FFB test | full survey to solve the RHRS Q2 | |
Swing | Moller measurement | ||
Friday, July 19 | Owl | Moller measurement | ready for the spin dance, may need short measurement to be complete. |
Day | control access for the RHRS Q2 magnet tripping | ||
Swing | Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
Saturday, July 20 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | control access for Q2 debugging | beam stop at 8:00am and back at 4:00pm | |
Swing | PITA/IA scan at 50uA, production at 50uA | ||
Sunday, July 21 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | production at 50uA | RHRS Q2 magnet is down | |
Swing | Qsqr measurement and production at 50uA | RHRS Q2 magnet is down | |
Monday, July 22 | Owl | production at 50uA, Moller measurement was paused | LCW leak in the west arc |
Day | control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode | LCW leak >10 hours | |
Swing | Qsq measurement, Detector alignment at low current. | 1 hour | |
Tuesday, July 23 | Owl | No beam due to LCW leak | >30h |
Day | control access for Q2 magnet, Compton laser work | Q2 is recovered around 12:00pm | |
Swing | No acceptable beam | 1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 | |
Wednesday, July 24 | Owl | No acceptable beam until 6:30am | Dump puck |
Day | Moller and Spin dance measurement | Success!! Final Wien -13.3 | |
Swing |
|
Short access for changing the cable to integrate mode and changing the Compton attenuator | |
Thursday, July 25 | Owl | production at 70uA | |
Day |
|
BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers | |
Swing |
|
||
Friday, July 26 | Owl | production at 70uA | deltaT on the collimator increased. Water out temp exceeding our set limits |
Day |
|
receiver swapped; DO NOT MOVE THE TARGET! | |
Swing |
|
||
Saturday, July 27 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day | production at 70uA; DO NOT MOVE THE TARGET! | ||
Swing | production at 70uA; DO NOT MOVE THE TARGET! | ||
Sunday, July 28 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing | production at 70uA; DO NOT MOVE THE TARGET! | ||
Monday, July 29 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing |
|
||
Tuesday, July 30 | Owl | low current running beginning at 8am (if approved) | |
Day | Target fix | ||
Swing |
|
||
Wednesday, July 31 | Owl | production at 70uA | |
Day |
|
| |
Swing |
|
||
Thursday, August 1 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | Production running at 70uA | ||
Friday, August 2 | Owl | Production running at 70uA | |
Day |
|
raster changed to 4 x 5 mm2 for slug 26 | |
Swing | Production running at 70uA | ||
Saturday, August 3 | Owl | Production running at 70uA | |
Day |
|
changed to Pb9 target | |
Swing | Production running at 70uA | ||
Sunday, August 4 | Owl | Production running at 70uA | |
Day | Moller starting at 8am | ||
Swing | more Moller | ||
Monday, August 5 | Owl | more Moller | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 6 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Wednesday, August 7 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Thursday, August 8 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Friday, August 9 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Saturday, August 10 | Owl |
|
|
Day |
|
||
Swing |
|
||
Sunday, August 11 | Owl |
|
|
Day |
|
||
Swing | Production running at 70uA | ||
Monday, August 12 | Owl | Production running at 70uA with | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 13 | Owl | Production running at 70uA | |
Day |
| ||
Swing | Transverse Polarized Measurement | roduction running until beam was taken away for Hall B. | |
Wednesday, August 14 | Owl | Transverse Polarized Measurement | |
Day |
|
| |
Swing
|
Production running at 70uAroduction running until beam was taken away for Hall B. |
| |
Thursday, August 15 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA |
| |
Friday, August 16 | Owl | Production running at 70uA | Beam off at 7 AM to cool down the hall prior to Compton work |
Day |
|
| |
Swing | Production running at 70uA | No beam due to CHL and Hall B restore | |
Saturday, August 17 | Owl | Production running at 70uA | No beam due to CHL and Hall B restore |
Day | Production running at 70uA |
| |
Swing | Production running at 70uA | Garrett | |
Sunday, August 18 | Owl | Production running at 70uA | |
Day | Moller measurement | ||
Swing | Production running at 70uA |
| |
Monday, August 19 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Tuesday, August 20 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Wednesday, August 21 | Owl | Production running at 70uA | |
Day | Moller | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. | |
Swing | Q2 measurement | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. | |
Thursday, August 22 | Owl | Production running at 70uA | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. |
Day | Wien flip | Beam taken away at 8:30. Mott measurements before Wien flip. MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. | |
Swing | Wien flip and beam restoration | Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check. | |
Friday, August 23 | Owl | Production, 70uA | Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through. |
Day | Production, 70uA | Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune. | |
Swing | Production running at 70uA | Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz) | |
Saturday, August 24 | Owl | Production, 70uA | |
Day | Production, 70uA | Beam taken away for Hall B tuning around noon. 6.5hours of total downtime. opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset. | |
Swing | Production running at 70uA | Beam back at 6pm. Steady production running since then. | |
Sunday, August 25 | Owl | Production, 70uA | |
Day | Production, 70uA | ||
Swing | Production running at 70uA | ||
Monday, August 26 | Owl | Production, 70uA | |
Day | Moller | ||
Swing | Production, 70uA | No compton, got straight through beam | |
Tuesday, August 27 | Owl | Production, 70uA | No compton, got straight through beam |
Day | Compton tuning | ||
Swing | Production 71uA Energy measurement |
Parasitic energy measurement during production (not completed) | |
Wednesday, August 28 | Owl | Production 70uA | |
Day | Stubby quatz; blinding study | completed | |
Swing | Stubby quatz; blinding study; recovery | completed; recovery took until 2AM. Seen increased widths with 1C19/1C20 10% increase | |
Thursday, August 29 | Owl | Production, 70uA | No compton, got straight through beam |
Day | Compton tuning + Main Exp tuning; | completed intrinsic spot size adjustments by 4 15; | |
Swing | Main experiment width test. Test S0 integrity with short low current run. Pole tip re-scattering | width test showed problems with the dithering sensitivity; S0 test could not be done because LHRS regulator was broken; Pole tip rescattering data taking went well (sieve runs were only with the left arm). | |
Friday, August 30 | Owl | Aux msmts and try different 1H01/1H04 settings to see if they provide changes in sensitivities | this was done with poor sensitivities on dithering and L arm only |
Day | Access to address R arm | plan developed to address dithering | |
Swing | Access wrapped up by 8 pm; implementation of Todd's phase telescope | phase telescope didn't provide the needed sensitivities but proved that we can indeed reconfigure quads to impact sensitivities | |
Saturday, August 31 | Owl | Production 71uA | still with poor sensitivities |
Day | Moller | ||
Swing | Moller | ||
Sunday, September 1 | Owl | Optics | |
Day | Optics wrap up by 11 AM (including preli tgt density study); access to blind ATs and take them out of counting mode; Attempt beam restore through Compton | first settings didn't provide a good solution but clear path | |
Swing | recovered sensitivities; good Compton rates; back to production | ||
Monday, September 1 | Owl | Production 71uA | |
Day | Production 71uA | ||
Swing | Production 71uA | ||
Tuesday, September 3 | Owl | Production 71uA; further 1h tgt density study | |
Day | Production 71uA; injector prebuncher checks; | ||
Swing | Q2; Production 71uA |