Difference between revisions of "Run plan history"

From PREX Wiki
Jump to navigationJump to search
 
(16 intermediate revisions by 5 users not shown)
Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
 
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] << [[RunPlanDaily]] <br><br>
 
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] << [[RunPlanDaily]] <br><br>
  
Copy weekly run plan tables here.  Most recent at the top.
+
Copy weekly run plan tables here.
  
  
Line 294: Line 294:
 
| tuning for most of shift, hope for Production CW  
 
| tuning for most of shift, hope for Production CW  
 
|-
 
|-
 +
| rowspan="3" | Monday, July 8
 +
|Owl
 +
| no beam
 +
|
 +
|-
 +
|Day
 +
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 +
|Production CW ,
 +
|-
 +
|Swing
 +
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 +
|Production CW
 +
|-
 +
| rowspan="3" | Tuesday, July 9
 +
|Owl
 +
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 +
| Parasitic CW ,  tuning for higher passes
 +
|-
 +
|Day
 +
| Low current, different triggers on C, Pb
 +
| Parasitic CW ,  tuning for higher passes
 +
|-
 +
|Swing
 +
|Low current GEMS,Sieve/switch to integrating (and remove S0?)
 +
|Parasitic CW ,  tuning for higher passes
 +
|-
 +
| rowspan="3" | Wednesday, July 10
 +
|Owl
 +
| Detector alignment and low current counting mode
 +
|CW low current
 +
|-
 +
| Day
 +
| High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 +
| 50uA
 +
|-
 +
| Swing
 +
| Moller commissioning
 +
| <2uA
 +
|-
 +
| rowspan="3" | Thursday, July 11
 +
|Owl
 +
|Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on)
 +
|Experts are looking at data, FFB was not working
 +
|-
 +
| Day
 +
| Hysteresis recovery, machine retuning
 +
| Hysteresis recovery done, no beam in the hall.
 +
|-
 +
| Swing
 +
| No beam in the hall
 +
|
 +
|-
 +
| rowspan="3" | Friday, July 12
 +
|Owl
 +
|Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies 
 +
|No beam in the hall
 +
|-
 +
| Day
 +
| Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian)
 +
| No beam in the hall
 +
|-
 +
| Swing
 +
| Try FFB and 208Pb production.
 +
| No beam in the hall
 +
|-
 +
| rowspan="3" | Saturday, July 13
 +
|Owl
 +
|Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). 
 +
| no beam in the hall
 +
|-
 +
| Day
 +
| Continue with owl shift plan.
 +
| No beam
 +
|-
 +
| Swing
 +
| Continue with today's owl shift plan
 +
| got beam ~8 pm. Checked raster size and started production data taking without FFB
 +
|-
 +
| rowspan="3" | Sunday, July 14
 +
|Owl
 +
| Production+ analysis. FFB (30 min), BMW (30 min), Aq 
 +
| FFB tried, but didn't work.
 +
|-
 +
| Day
 +
| Production+ analysis
 +
|
 +
|-
 +
| Swing
 +
| Production+ analysis
 +
|
 +
|-
 +
| rowspan="3" | Monday, July 15
 +
|Owl
 +
| Production+ analysis. 
 +
| Except ~3 hour down time, we took good data
 +
|-
 +
| Day
 +
| FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning.
 +
| MOLLER polarimeter commissioning is going on
 +
|-
 +
| Swing
 +
|MOLLER commissioning
 +
|
 +
|-
 +
| rowspan="3" | Tuesday, July 16
 +
|Owl
 +
|MOLLER Polarimeter and FFB commissioning 
 +
|
 +
|-
 +
| Day
 +
| production after pass change
 +
|
 +
|-
 +
| Swing
 +
|change IHWP ('out'), BPM and BCM calibration (Caryn)
 +
|Done
 +
|-
 +
| rowspan="3" | Wednesday, July 17
 +
|Owl
 +
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' 
 +
|
 +
|-
 +
| Day
 +
| HallB tuning no beam and frame hunting I
 +
|
 +
|-
 +
| Swing
 +
|frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster
 +
|
 +
|-
 +
| rowspan="3" | Thursday, July 18
 +
|Owl
 +
|IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off 
 +
|
 +
|-
 +
| Day
 +
| 50 microAmp production, PQB study, FFB test
 +
| full survey to solve the RHRS Q2 
 +
|-
 +
| Swing
 +
|Moller measurement
 +
|
 +
|-
 +
| rowspan="3" | Friday, July 19
 +
|Owl
 +
|Moller measurement
 +
|ready for the spin dance, may need short measurement to be complete.
 +
|-
 +
| Day
 +
|control access for the RHRS Q2 magnet tripping
 +
|
 +
|-
 +
| Swing
 +
|Bandwidth, BCM, FFB,  Left arm only production at 50uA
 +
|
 +
|-
 +
|-
 +
| rowspan="3" | Saturday, July 20
 +
|Owl
 +
|production at 50uA
 +
|RHRS Q2 magnet is down
 +
|-
 +
| Day
 +
|control access for Q2 debugging
 +
|beam stop at 8:00am and back at 4:00pm
 +
|-
 +
| Swing
 +
|PITA/IA scan at 50uA, production at 50uA
 +
|
 +
|-
 +
|-
 +
| rowspan="3" | Sunday, July 21
 +
|Owl
 +
|production at 50uA
 +
|RHRS Q2 magnet is down
 +
|-
 +
| Day
 +
|production at 50uA
 +
| RHRS Q2 magnet is down
 +
|-
 +
| Swing
 +
| Qsqr measurement and production at 50uA
 +
| RHRS Q2 magnet is down
 +
|-
 +
|-
 +
| rowspan="3" | Monday, July 22
 +
|Owl
 +
|production at 50uA, Moller measurement was paused 
 +
|LCW leak in the west arc
 +
|-
 +
| Day
 +
|control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode 
 +
|LCW leak >10 hours
 +
|-
 +
| Swing
 +
| Qsq measurement, Detector alignment at low current. 
 +
|1 hour
 +
|-
 +
|-
 +
| rowspan="3" | Tuesday, July 23
 +
|Owl
 +
|No beam due to LCW leak 
 +
|>30h
 +
|-
 +
| Day
 +
|control access for Q2 magnet, Compton laser work 
 +
|Q2 is recovered around 12:00pm
 +
|-
 +
| Swing
 +
| No acceptable beam
 +
|1H04E had trouble locking, ion chamber and Compton high rates,  Faraday cup2 
 +
|-
 +
| rowspan="3" | Wednesday, July 24
 +
|Owl
 +
|No acceptable beam until 6:30am
 +
|Dump puck
 +
|-
 +
| Day
 +
|Moller and Spin dance measurement
 +
| Success!! Final Wien -13.3
 +
|-
 +
| Swing
 +
|
 +
# [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]]
 +
# Low current: detector alignment (Devi, Kent, Dustin)
 +
# Qsq measurement (Bob)
 +
# Short access to go to integrating mode (Devi)
 +
# SAM HV adjustment (Devi)
 +
# Current scan (75 - 5 uA), PITA scan (Caryn)
 +
# 30 minute PROD run at 50uA to check widths
 +
# Production at 70uA 
 +
| Short access for changing the cable to integrate mode and changing the Compton attenuator
 +
|-
 +
| rowspan="3" | Thursday, July 25
 +
|Owl
 +
|production at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Planned:
 +
#* production at 70uA
 +
#* ~30 minutes for injector bias tests during Hall C gas work (Caryn)
 +
# Unplanned:
 +
#* Access to fix the BPMs/ move away from beamline (Francis)
 +
#* Need to fix the BCMs (Musson)
 +
| BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers
 +
|-
 +
| Swing
 +
|
 +
# [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]]
 +
# production at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Friday, July 26
 +
|Owl
 +
|production at 70uA
 +
| deltaT on the collimator increased.  Water out temp exceeding our set limits
 +
|-
 +
| Day
 +
|
 +
# production at 70uA
 +
# Brief access to swap the digital receiver when Musson and Co. ready
 +
# Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
 +
| receiver swapped; DO NOT MOVE THE TARGET!
 +
|-
 +
| Swing
 +
|
 +
# production at 70uA
 +
# special spot run with VDCs (Kent)
 +
# careful collimator temperature study (Kent)
 +
|
 +
|-
 +
| rowspan="3" | Saturday, July 27
 +
|Owl
 +
|production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| Day
 +
|production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| Swing
 +
| production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| rowspan="3" | Sunday, July 28
 +
|Owl
 +
|production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| Day
 +
|
 +
# production at 70uA; DO NOT MOVE THE TARGET!
 +
# spot++ to assess the target 
 +
|
 +
|-
 +
| Swing
 +
| production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| rowspan="3" | Monday, July 29
 +
|Owl
 +
|production at 70uA; DO NOT MOVE THE TARGET!
 +
|
 +
|-
 +
| Day
 +
|
 +
*low current running (expert driven, if approved)
 +
*# bandwidth study
 +
*# MOLLER test
 +
|
 +
|-
 +
| Swing
 +
|
 +
*low current running (expert driven)
 +
*# MOLLER test
 +
|
 +
|-
 +
| rowspan="3" | Tuesday, July 30
 +
|Owl
 +
|low current running beginning at 8am (if approved)
 +
|
 +
|-
 +
| Day
 +
| Target fix
 +
|
 +
|-
 +
| Swing
 +
|
 +
* Tests with no target
 +
# collimator centering angles with tune beam
 +
# BCM calibrations
 +
# BPM calibrations
 +
# position feedback study
 +
|
 +
|-
 +
| rowspan="3" | Wednesday, July 31
 +
|Owl
 +
|production at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# HRS quad repairs
 +
# target repairs
 +
# Compton work
 +
# BCM repair
 +
|
 +
# HRS quad repairs - both operational; nothing really done to right
 +
# target repairs - mechanical work done, modifying software for new setpoints
 +
# Compton work ongoing
 +
# 2nd one working as well as we can tell
 +
|-
 +
| Swing
 +
|
 +
# Raster check
 +
# Detector alignment (low current)
 +
#* Main detectors
 +
#* AT detectors
 +
# BCM test and Current and Pita scans
 +
# production at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Thursday, August 1
 +
| Owl
 +
| production at 70uA
 +
|
 +
|-
 +
| Day
 +
| production at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|-
 +
| rowspan="3" | Friday, August 2
 +
|Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Wien flip starting at 8:30am
 +
# Compton work in the hall: lens, mode-matching, PPLN tuning
 +
#Production 70uA; (IHWP OUT, start slug 26)
 +
|raster changed to 4 x 5 mm2 for slug 26
 +
|-
 +
| Swing
 +
|Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Saturday, August 3
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Address issues-- Col. temps, and increased det. widths
 +
#Production running at 70uA
 +
| changed to Pb9 target
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Sunday, August 4
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Moller starting at 8am
 +
|
 +
|-
 +
| Swing
 +
| more Moller
 +
|-
 +
| rowspan="3" | Monday, August 5
 +
| Owl
 +
| more Moller
 +
|
 +
|-
 +
| Day
 +
|
 +
# Compton work in Hall
 +
#Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA 
 +
|
 +
|-
 +
| rowspan="3" | Tuesday, August 6
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Production until 10:30 am
 +
#Controlled access for Compton work
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Wednesday, August 7
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Production running at 70uA
 +
# Compton Chicane tuning;
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Thursday, August 8
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
#Production running at 70uA
 +
# Production until 9:00 am
 +
# No beam during Hall C witness beam setup and injector anode-bias remove
 +
# Production  running at 70uA
 +
# <s>Moller solenoid axis and lock</s>
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Friday, August 9
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Production running at 70uA
 +
# Hall Access
 +
# Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Saturday, August 10
 +
| Owl
 +
|
 +
# Production running at 70uA until 6:30 am
 +
# Ask to save the Compton-Chicane tune configuration
 +
# Request for Compton Straight-Through beam
 +
# Take production at 70 uA until Moller crew arive
 +
|
 +
|-
 +
| Day
 +
|
 +
# Moller measurement
 +
# Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
|
 +
# Moller measurement
 +
# <s>Production running at 70uA</s>
 +
|
 +
|-
 +
| rowspan="3" | Sunday, August 11
 +
| Owl
 +
|
 +
# Request Compton Straight-Through tune
 +
# Production running at 70uA with Compton Straight-Through beam
 +
|
 +
|-
 +
| Day
 +
|
 +
# Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|-
 +
| rowspan="3" | Monday, August 12
 +
| Owl
 +
| Production running at 70uA with
 +
|
 +
|-
 +
| Day
 +
|
 +
# Production running at 70uA
 +
# Commissioning targets required for Transverse measurements include raster size calibrations
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|-
 +
| rowspan="3" | Tuesday, August 13
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
|
 +
# Planned accelerator downtime:Beam studies
 +
# Preparations for Transverse Polarized Measurement
 +
|-
 +
| Swing
 +
| Transverse Polarized Measurement
 +
| roduction running until beam was taken away for Hall B.
 +
|-
 +
| rowspan="3" | Wednesday, August 14
 +
| Owl
 +
| Transverse Polarized Measurement
 +
|
 +
|-
 +
| Day
 +
|
 +
# Transverse Polarized Measurement
 +
# Wein Flip back to `Right'
 +
|
 +
# Transverse work done at ~10:30.
 +
# Hand things off to OPS for beam studies and Wien flip.
 +
|-Cornejo
 +
| Swing
 +
# Establish PQB after Wien flip
 +
# PITA scan
 +
| Production running at 70uAroduction running until beam was taken away for Hall B.
 +
|
 +
# Caryn checks PQB (at ILD). Done by ~16:30
 +
# PITA scan ~18:45
 +
# Moved to D5-208Pb8-D6 target ~20:45
 +
|-
 +
| rowspan="3" | Thursday, August 15
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
# Target out for Compton background studies
 +
# Production back on Pb#8
 +
|-
 +
| rowspan="3" | Friday, August 16
 +
| Owl
 +
| Production running at 70uA
 +
| Beam off at 7 AM to cool down the hall prior to Compton work
 +
|-
 +
| Day
 +
|
 +
# Work in the hall for to replace Compton fiber amp
 +
# Jessie will work on Tungsten Collimator flow reedback issue
 +
|
 +
# Jack added additional shielding around the hall
 +
# Dave, Amali and Caryn worked on the laser
 +
# CHL problems starting at 12:03 means no opportunity of beam during shift
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
| No beam due to CHL and Hall B restore
 +
|-
 +
| rowspan="3" | Saturday, August 17
 +
| Owl
 +
| Production running at 70uA
 +
| No beam due to CHL and Hall B restore
 +
|-
 +
| Day
 +
| Production running at 70uA
 +
|
 +
# Beam returns around 8:30 AM
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
| Garrett
 +
|-
 +
| rowspan="3" | Sunday, August 18
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Moller measurement
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
# Moller measurement concluded
 +
# 70 uA beam restored to hall
 +
# Production running
 +
|-
 +
| rowspan="3" | Monday, August 19
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Tuesday, August 20
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Wednesday, August 21
 +
| Owl
 +
| Production running at 70uA
 +
|
 +
|-
 +
| Day
 +
| Moller
 +
| Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference.
 +
|-
 +
| Swing
 +
| Q2 measurement
 +
| Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight.
 +
|-
 +
| rowspan="3" | Thursday, August 22
 +
| Owl
 +
| Production running at 70uA
 +
| Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip.
 +
|-
 +
| Day
 +
| Wien flip
 +
| Beam taken away at 8:30. Mott measurements before Wien flip. <br> MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime.
 +
|-
 +
| Swing
 +
| Wien flip and beam restoration
 +
| Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check.
 +
|-
 +
| rowspan="3" | Friday, August 23
 +
| Owl
 +
| Production, 70uA
 +
| Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through.<br>
 +
|-
 +
| Day
 +
| Production, 70uA
 +
| Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune.
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
| Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz)
 +
|-
 +
| rowspan="3" | Saturday, August 24
 +
| Owl
 +
| Production, 70uA
 +
|
 +
|-
 +
| Day
 +
| Production, 70uA
 +
| Beam taken away for Hall B tuning around noon. 6.5hours of total downtime.<br> opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset.
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
| Beam back at 6pm. Steady production running since then. 
 +
|-
 +
| rowspan="3" | Sunday, August 25
 +
| Owl
 +
| Production, 70uA
 +
|
 +
|-
 +
| Day
 +
| Production, 70uA
 +
|
 +
|-
 +
| Swing
 +
| Production running at 70uA
 +
|
 +
|-
 +
| rowspan="3" | Monday, August 26
 +
| Owl
 +
| Production, 70uA
 +
|
 +
|-
 +
| Day
 +
| Moller
 +
|
 +
|-
 +
| Swing
 +
| Production, 70uA
 +
| No compton, got straight through beam
 +
|-
 +
| rowspan="3" | Tuesday, August 27
 +
| Owl
 +
| Production, 70uA
 +
| No compton, got straight through beam
 +
|-
 +
| Day
 +
| Compton tuning
 +
|
 +
|-
 +
| Swing
 +
| Production 71uA<br>Energy measurement
 +
| Parasitic energy measurement during production (not completed)
 +
|-
 +
| rowspan="3" | Wednesday, August 28
 +
| Owl
 +
| Production 70uA
 +
|
 +
|-
 +
| Day
 +
| Stubby quatz; blinding study
 +
| completed
 +
|-
 +
| Swing
 +
| Stubby quatz; blinding study; recovery
 +
| completed; recovery took until 2AM. Seen increased widths with 1C19/1C20 10% increase
 +
|-style="background: #FCF3CF;
 +
| rowspan="3" | Thursday, August 29
 +
| Owl
 +
| Production, 70uA
 +
| No compton, got straight through beam
 +
|-style="background: #FCF3CF;
 +
| Day
 +
| Compton tuning + Main Exp tuning;
 +
| completed intrinsic spot size adjustments by 4 15;
 +
|-style="background: #FCF3CF;
 +
| Swing
 +
| Main experiment width test. Test S0 integrity with short low current run. Pole tip re-scattering
 +
| width test showed problems with the dithering sensitivity; S0 test could not be done because LHRS regulator was broken; Pole tip rescattering data taking went well (sieve runs were only with the left arm).
 +
|-
 +
| rowspan="3" | Friday, August 30
 +
| Owl
 +
| Aux msmts and try different 1H01/1H04 settings to see if they provide changes in sensitivities
 +
| this was done with poor sensitivities on dithering and L arm only
 +
|-
 +
| Day
 +
| Access to address R arm
 +
| plan developed to address dithering
 +
|-
 +
| Swing
 +
| Access wrapped up by 8 pm; implementation of Todd's phase telescope
 +
| phase telescope didn't provide the needed sensitivities but proved that we can indeed reconfigure quads to impact sensitivities
 +
|-
 +
| rowspan="3" | Saturday, August 31
 +
| Owl
 +
| Production 71uA
 +
| still with poor sensitivities
 +
|-
 +
| Day
 +
| Moller
 +
|
 +
|-
 +
| Swing
 +
| Moller
 +
|
 +
|-
 +
| rowspan="3" | Sunday, September 1
 +
| Owl
 +
| Optics
 +
|
 +
|-
 +
| Day
 +
| Optics wrap up by 11 AM (including preli tgt density study); access to blind ATs and take them out of counting mode; Attempt beam restore through Compton
 +
| first settings didn't provide a good solution but clear path
 +
|-
 +
| Swing
 +
| recovered sensitivities; good Compton rates; back to production
 +
|
 +
|-
 +
| rowspan="3" | Monday, September 1
 +
| Owl
 +
| Production 71uA
 +
|
 +
|-
 +
| Day
 +
| Production 71uA
 +
|
 +
|-
 +
| Swing
 +
| Production 71uA
 +
|
 +
|-
 +
| rowspan="3" | Tuesday, September 3
 +
| Owl
 +
| Production 71uA; further 1h tgt density study
 +
|
 +
|-
 +
| Day
 +
| Production 71uA; injector prebuncher checks;
 +
|
 +
|-
 +
| Swing
 +
| Q2; Production 71uA
 +
|
 
|}
 
|}

Latest revision as of 12:46, 8 September 2019



PREX Main << Run Coordinator Tools << RunPlanDaily

Copy weekly run plan tables here.


Day, Date Shift Tasks (Responsible Party) Status
Friday, June 14 Owl
Day
Swing
Monday, June 17 Owl
Day Last day for planned collaboration work in Hall. Expecting 2A alignment
Swing Vacuum connections between US pipe and target and between target and collimator box.
Tuesday, June 18 Owl
Day Pump down the entire pivot to dump region; Expecting 2B alignment
Swing Target software checks
Wednesday, June 19 Owl
Day Hall Closed. Final Checklist. Possible first beam in Hall A
Swing Continue beam in Hall A for tuning. Start low beam checkout.
Thursday, June 20 Owl Continue low beam current checkout. Completed Collimator search.
Day Tuning
Swing Tune up and Low current commissioning.
Friday, June 21 Owl Low current commissioning. Started optics Commissioned 45deg and 90deg targets. Calibrated ion chambers. Bullseye scan.
Day High current + Compton rate tuning.
Swing High current calibration after tuning (Caryn). Low current commissioning. Restart Optics (Seamus, Sanghwa, Ryan) Basic run quality plot macro needed (Sanghwa).
Saturday, June 22 Owl Opportunistic: Beam Modulation (Paul K, Vectoria) ESR 15K helium issue, scattering chamber vacuum degration investigation
Day Optics.
Swing Low current cavity (Ye, Cip). Minimum chase.
Sunday, June 23 Owl Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) Inner edge search DONE.
Day Minimize width.
Swing Minimize width. Minimum chase.
Monday, June 24 Owl Quartz align; quartz rate. (Dustin)
Day Optics verification. ESR 15K helium repair is ongoing.
Swing No beam.
Tuesday, June 25 Owl No beam. shift cancelled.
Day Target cooling down. shift cancelled
Swing Optics. Vacuum issue. No beam for the whole shift.
Wednesday, June 26 Owl Optics.
Day Optics. Send beam through Compton chicane. Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened.
Swing Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. Cavity lock commissioning completed
Thursday, June 27 Owl Optics (db scan), Q2 measurement, detector alignment db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
Day Send beam through Compton chicane, Compton commissioning. Fail to send beam through compton chicane
Swing Rate scan (Dustin) and SAM shutter test, raster size verification All completed
Friday, June 28 Owl Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
Day Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
Swing Compton commissioning, current + PITA scan, finish up high current test, BMW Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB.
Saturday, June 29 Owl Production (natural Pb, Carbon) Down due to target vacuum problem
Day Production with 208Pb? Rate studies, Phase 1. Down due to target vacuum problem
Swing Sweep + access. Phase 2 rate studies Down due to target vacuum problem
Sunday, June 30 Owl 208Pb Production. Target Fleet Commissioning Down due to target vacuum problem
Day Moller commissioning. Down due to target vacuum problem
Swing Optics - Y target finding, Bandwidth. Collimator heating axis study. Down due to target vacuum problem
Monday, July 1 Owl Down due to target vacuum problem
Day Beam Studies Target vacuum leak source found, recovery in progress
Swing Site power loss while ramping up HRS magnets after target cool down
Tuesday, July 2 Owl Down due to the site power loss, https://logbooks.jlab.org/entry/3697845
Day Down due to the site power loss
Swing Down due to the site power loss
Wednesday, July 3 Owl Down due to the site power loss
Day Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon
Currently we are:
Sieve OUT
Integrating mode detector
Raster off (tested ok yesterday)
Cavity in low current mode
Swing
Thursday, July 4 Owl Restricted
Day Restricted
Swing Restricted
Friday, July 5 Owl Restricted
Day Target cool down, Magnet ramp up Restricted->Controlled access
Swing Cold target monitoring, Magnet ramp up Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL
Saturday, July 6 Owl Cold target monitoring. Power outage in SL, no beam
Day Got 70uA to dump, then Cold target monitoring. 8am - 5S optics, tune B after 5S
Swing Cold target monitoring. Tuned accelerator, took beam away, 5S optics, tune B after 5S
Sunday, July 7 Owl Cold target monitoring. Tuned accelerator, took beam away, 5S optics, tune B after 5S
Day low current cav commissioning (for EPICS) and beamline optics Tuned C, then tune beam to A, then 20nA CW, then back taken for retuning
Swing High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan tuning for most of shift, hope for Production CW
Monday, July 8 Owl no beam
Day High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Production CW ,
Swing High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Production CW
Tuesday, July 9 Owl High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Parasitic CW , tuning for higher passes
Day Low current, different triggers on C, Pb Parasitic CW , tuning for higher passes
Swing Low current GEMS,Sieve/switch to integrating (and remove S0?) Parasitic CW , tuning for higher passes
Wednesday, July 10 Owl Detector alignment and low current counting mode CW low current
Day High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan Detailed plan 50uA
Swing Moller commissioning <2uA
Thursday, July 11 Owl Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on) Experts are looking at data, FFB was not working
Day Hysteresis recovery, machine retuning Hysteresis recovery done, no beam in the hall.
Swing No beam in the hall
Friday, July 12 Owl Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies No beam in the hall
Day Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian) No beam in the hall
Swing Try FFB and 208Pb production. No beam in the hall
Saturday, July 13 Owl Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). no beam in the hall
Day Continue with owl shift plan. No beam
Swing Continue with today's owl shift plan got beam ~8 pm. Checked raster size and started production data taking without FFB
Sunday, July 14 Owl Production+ analysis. FFB (30 min), BMW (30 min), Aq FFB tried, but didn't work.
Day Production+ analysis
Swing Production+ analysis
Monday, July 15 Owl Production+ analysis. Except ~3 hour down time, we took good data
Day FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. MOLLER polarimeter commissioning is going on
Swing MOLLER commissioning
Tuesday, July 16 Owl MOLLER Polarimeter and FFB commissioning
Day production after pass change
Swing change IHWP ('out'), BPM and BCM calibration (Caryn) Done
Wednesday, July 17 Owl Production with 50uA with Aq, BMW and Energy-mode:'RF-off'
Day HallB tuning no beam and frame hunting I
Swing frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster
Thursday, July 18 Owl IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off
Day 50 microAmp production, PQB study, FFB test full survey to solve the RHRS Q2
Swing Moller measurement
Friday, July 19 Owl Moller measurement ready for the spin dance, may need short measurement to be complete.
Day control access for the RHRS Q2 magnet tripping
Swing Bandwidth, BCM, FFB, Left arm only production at 50uA
Saturday, July 20 Owl production at 50uA RHRS Q2 magnet is down
Day control access for Q2 debugging beam stop at 8:00am and back at 4:00pm
Swing PITA/IA scan at 50uA, production at 50uA
Sunday, July 21 Owl production at 50uA RHRS Q2 magnet is down
Day production at 50uA RHRS Q2 magnet is down
Swing Qsqr measurement and production at 50uA RHRS Q2 magnet is down
Monday, July 22 Owl production at 50uA, Moller measurement was paused LCW leak in the west arc
Day control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode LCW leak >10 hours
Swing Qsq measurement, Detector alignment at low current. 1 hour
Tuesday, July 23 Owl No beam due to LCW leak >30h
Day control access for Q2 magnet, Compton laser work Q2 is recovered around 12:00pm
Swing No acceptable beam 1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2
Wednesday, July 24 Owl No acceptable beam until 6:30am Dump puck
Day Moller and Spin dance measurement Success!! Final Wien -13.3
Swing
  1. Beam recovery procedure
  2. Low current: detector alignment (Devi, Kent, Dustin)
  3. Qsq measurement (Bob)
  4. Short access to go to integrating mode (Devi)
  5. SAM HV adjustment (Devi)
  6. Current scan (75 - 5 uA), PITA scan (Caryn)
  7. 30 minute PROD run at 50uA to check widths
  8. Production at 70uA
Short access for changing the cable to integrate mode and changing the Compton attenuator
Thursday, July 25 Owl production at 70uA
Day
  1. Planned:
    • production at 70uA
    • ~30 minutes for injector bias tests during Hall C gas work (Caryn)
  2. Unplanned:
    • Access to fix the BPMs/ move away from beamline (Francis)
    • Need to fix the BCMs (Musson)
BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers
Swing
  1. Beam recovery procedure
  2. production at 70uA
Friday, July 26 Owl production at 70uA deltaT on the collimator increased. Water out temp exceeding our set limits
Day
  1. production at 70uA
  2. Brief access to swap the digital receiver when Musson and Co. ready
  3. Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
receiver swapped; DO NOT MOVE THE TARGET!
Swing
  1. production at 70uA
  2. special spot run with VDCs (Kent)
  3. careful collimator temperature study (Kent)
Saturday, July 27 Owl production at 70uA; DO NOT MOVE THE TARGET!
Day production at 70uA; DO NOT MOVE THE TARGET!
Swing production at 70uA; DO NOT MOVE THE TARGET!
Sunday, July 28 Owl production at 70uA; DO NOT MOVE THE TARGET!
Day
  1. production at 70uA; DO NOT MOVE THE TARGET!
  2. spot++ to assess the target
Swing production at 70uA; DO NOT MOVE THE TARGET!
Monday, July 29 Owl production at 70uA; DO NOT MOVE THE TARGET!
Day
  • low current running (expert driven, if approved)
    1. bandwidth study
    2. MOLLER test
Swing
  • low current running (expert driven)
    1. MOLLER test
Tuesday, July 30 Owl low current running beginning at 8am (if approved)
Day Target fix
Swing
  • Tests with no target
  1. collimator centering angles with tune beam
  2. BCM calibrations
  3. BPM calibrations
  4. position feedback study
Wednesday, July 31 Owl production at 70uA
Day
  1. HRS quad repairs
  2. target repairs
  3. Compton work
  4. BCM repair
  1. HRS quad repairs - both operational; nothing really done to right
  2. target repairs - mechanical work done, modifying software for new setpoints
  3. Compton work ongoing
  4. 2nd one working as well as we can tell
Swing
  1. Raster check
  2. Detector alignment (low current)
    • Main detectors
    • AT detectors
  3. BCM test and Current and Pita scans
  4. production at 70uA
Thursday, August 1 Owl production at 70uA
Day production at 70uA
Swing Production running at 70uA
Friday, August 2 Owl Production running at 70uA
Day
  1. Wien flip starting at 8:30am
  2. Compton work in the hall: lens, mode-matching, PPLN tuning
  3. Production 70uA; (IHWP OUT, start slug 26)
raster changed to 4 x 5 mm2 for slug 26
Swing Production running at 70uA
Saturday, August 3 Owl Production running at 70uA
Day
  1. Address issues-- Col. temps, and increased det. widths
  2. Production running at 70uA
changed to Pb9 target
Swing Production running at 70uA
Sunday, August 4 Owl Production running at 70uA
Day Moller starting at 8am
Swing more Moller
Monday, August 5 Owl more Moller
Day
  1. Compton work in Hall
  2. Production running at 70uA
Swing Production running at 70uA
Tuesday, August 6 Owl Production running at 70uA
Day
  1. Production until 10:30 am
  2. Controlled access for Compton work
Swing Production running at 70uA
Wednesday, August 7 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Compton Chicane tuning;
Swing Production running at 70uA
Thursday, August 8 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Production until 9:00 am
  3. No beam during Hall C witness beam setup and injector anode-bias remove
  4. Production running at 70uA
  5. Moller solenoid axis and lock
Swing Production running at 70uA
Friday, August 9 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Hall Access
  3. Production running at 70uA
Swing Production running at 70uA
Saturday, August 10 Owl
  1. Production running at 70uA until 6:30 am
  2. Ask to save the Compton-Chicane tune configuration
  3. Request for Compton Straight-Through beam
  4. Take production at 70 uA until Moller crew arive
Day
  1. Moller measurement
  2. Production running at 70uA
Swing
  1. Moller measurement
  2. Production running at 70uA
Sunday, August 11 Owl
  1. Request Compton Straight-Through tune
  2. Production running at 70uA with Compton Straight-Through beam
Day
  1. Production running at 70uA
Swing Production running at 70uA
Monday, August 12 Owl Production running at 70uA with
Day
  1. Production running at 70uA
  2. Commissioning targets required for Transverse measurements include raster size calibrations
Swing Production running at 70uA
Tuesday, August 13 Owl Production running at 70uA
Day
  1. Planned accelerator downtime:Beam studies
  2. Preparations for Transverse Polarized Measurement
Swing Transverse Polarized Measurement roduction running until beam was taken away for Hall B.
Wednesday, August 14 Owl Transverse Polarized Measurement
Day
  1. Transverse Polarized Measurement
  2. Wein Flip back to `Right'
  1. Transverse work done at ~10:30.
  2. Hand things off to OPS for beam studies and Wien flip.
Swing
  1. Establish PQB after Wien flip
  2. PITA scan
Production running at 70uAroduction running until beam was taken away for Hall B.
  1. Caryn checks PQB (at ILD). Done by ~16:30
  2. PITA scan ~18:45
  3. Moved to D5-208Pb8-D6 target ~20:45
Thursday, August 15 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
  1. Target out for Compton background studies
  2. Production back on Pb#8
Friday, August 16 Owl Production running at 70uA Beam off at 7 AM to cool down the hall prior to Compton work
Day
  1. Work in the hall for to replace Compton fiber amp
  2. Jessie will work on Tungsten Collimator flow reedback issue
  1. Jack added additional shielding around the hall
  2. Dave, Amali and Caryn worked on the laser
  3. CHL problems starting at 12:03 means no opportunity of beam during shift
Swing Production running at 70uA No beam due to CHL and Hall B restore
Saturday, August 17 Owl Production running at 70uA No beam due to CHL and Hall B restore
Day Production running at 70uA
  1. Beam returns around 8:30 AM
Swing Production running at 70uA Garrett
Sunday, August 18 Owl Production running at 70uA
Day Moller measurement
Swing Production running at 70uA
  1. Moller measurement concluded
  2. 70 uA beam restored to hall
  3. Production running
Monday, August 19 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Tuesday, August 20 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Wednesday, August 21 Owl Production running at 70uA
Day Moller Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference.
Swing Q2 measurement Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight.
Thursday, August 22 Owl Production running at 70uA Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip.
Day Wien flip Beam taken away at 8:30. Mott measurements before Wien flip.
MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime.
Swing Wien flip and beam restoration Mott measurement after the Wien flip, shows consistent results between IHWP IN and OUT within uncertainty. Followed by PQB check.
Friday, August 23 Owl Production, 70uA Beam restoration starting with Hall B tuning. Beam back to Hall A around the middle of swing, recived 70uA, straight through.
Day Production, 70uA Production running until beam was taken away for Hall B and Hall A Compton. Compton commissioning (to reduce downstream background rates). Injector re-tune.
Swing Production running at 70uA Beam back to Hall A (mid-swing), sent through the Compton Chicane. Compton backgrounroduction running until beam was taken away for Hall B.d rates are still higher than before (fluctuating between 4-5kHz)
Saturday, August 24 Owl Production, 70uA
Day Production, 70uA Beam taken away for Hall B tuning around noon. 6.5hours of total downtime.
opportunistic access in the meantime to reset AHU, more shielding added, left side camera control box reset.
Swing Production running at 70uA Beam back at 6pm. Steady production running since then.
Sunday, August 25 Owl Production, 70uA
Day Production, 70uA
Swing Production running at 70uA
Monday, August 26 Owl Production, 70uA
Day Moller
Swing Production, 70uA No compton, got straight through beam
Tuesday, August 27 Owl Production, 70uA No compton, got straight through beam
Day Compton tuning
Swing Production 71uA
Energy measurement
Parasitic energy measurement during production (not completed)
Wednesday, August 28 Owl Production 70uA
Day Stubby quatz; blinding study completed
Swing Stubby quatz; blinding study; recovery completed; recovery took until 2AM. Seen increased widths with 1C19/1C20 10% increase
Thursday, August 29 Owl Production, 70uA No compton, got straight through beam
Day Compton tuning + Main Exp tuning; completed intrinsic spot size adjustments by 4 15;
Swing Main experiment width test. Test S0 integrity with short low current run. Pole tip re-scattering width test showed problems with the dithering sensitivity; S0 test could not be done because LHRS regulator was broken; Pole tip rescattering data taking went well (sieve runs were only with the left arm).
Friday, August 30 Owl Aux msmts and try different 1H01/1H04 settings to see if they provide changes in sensitivities this was done with poor sensitivities on dithering and L arm only
Day Access to address R arm plan developed to address dithering
Swing Access wrapped up by 8 pm; implementation of Todd's phase telescope phase telescope didn't provide the needed sensitivities but proved that we can indeed reconfigure quads to impact sensitivities
Saturday, August 31 Owl Production 71uA still with poor sensitivities
Day Moller
Swing Moller
Sunday, September 1 Owl Optics
Day Optics wrap up by 11 AM (including preli tgt density study); access to blind ATs and take them out of counting mode; Attempt beam restore through Compton first settings didn't provide a good solution but clear path
Swing recovered sensitivities; good Compton rates; back to production
Monday, September 1 Owl Production 71uA
Day Production 71uA
Swing Production 71uA
Tuesday, September 3 Owl Production 71uA; further 1h tgt density study
Day Production 71uA; injector prebuncher checks;
Swing Q2; Production 71uA