Difference between revisions of "DAQ Doc Portal"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Documentation for the DAQ systems is curated here == DAQ Experts == == Shift Operators == == FAQ and common problems and solutions ==")
 
Line 6: Line 6:
  
 
== FAQ and common problems and solutions ==
 
== FAQ and common problems and solutions ==
 +
 +
== Goals for PrexII running ==
 +
 +
* Work on the Parity DAQ to bring the Trigger Supervisor (TS) into its proper overseer role
 +
** ✓ This requires shifting from COMPTON to ADAQ3 computer and verifying all connections and .crl files behave as expected (completed in [https://prex.jlab.org/wiki/index.php/DAQ_Meeting/20180523 5-23-2018 meeting])
 +
** ✓ Fix Trigger Supervisor DAQ to communicate correctly with Injector DAQ from ADAQ3 computer
 +
** ✓ Fix Counting Room DAQ and add to TS (should be easy)
 +
** Fix RHRS DAQ and add to TS
 +
** Fix LHRS DAQ and add to TS (should be harder)
 +
 +
* We want an automated system that will vastly simplify the life of WACs (Fall 2018)
 +
** It should read information from CODA, [https://epics.anl.gov/ EPICS], and shift operator schedules as runs start and stop
 +
** It should make standard analysis plots
 +
** And it should display these diagnostic and physics results on a collaboration viewable webpage
 +
** This will likely involve mimicking the existing ELOG automated systems
 +
 +
* We should rewrite the existing PAN (Parity ANalyzer) into JAPAN (Just Another Parity ANalyzer)
 +
** This is partly to update the codebase to incorporate the QWeak analysis updates
 +
** And also to build expertise and familiarity in the current collaboration
 +
** JAPAN is currently in development at [https://github.com/JeffersonLab/japan www.github.com/JeffersonLab/Japan] (private)

Revision as of 14:11, 23 May 2018

Documentation for the DAQ systems is curated here

DAQ Experts

Shift Operators

FAQ and common problems and solutions

Goals for PrexII running

  • Work on the Parity DAQ to bring the Trigger Supervisor (TS) into its proper overseer role
    • ✓ This requires shifting from COMPTON to ADAQ3 computer and verifying all connections and .crl files behave as expected (completed in 5-23-2018 meeting)
    • ✓ Fix Trigger Supervisor DAQ to communicate correctly with Injector DAQ from ADAQ3 computer
    • ✓ Fix Counting Room DAQ and add to TS (should be easy)
    • Fix RHRS DAQ and add to TS
    • Fix LHRS DAQ and add to TS (should be harder)
  • We want an automated system that will vastly simplify the life of WACs (Fall 2018)
    • It should read information from CODA, EPICS, and shift operator schedules as runs start and stop
    • It should make standard analysis plots
    • And it should display these diagnostic and physics results on a collaboration viewable webpage
    • This will likely involve mimicking the existing ELOG automated systems
  • We should rewrite the existing PAN (Parity ANalyzer) into JAPAN (Just Another Parity ANalyzer)
    • This is partly to update the codebase to incorporate the QWeak analysis updates
    • And also to build expertise and familiarity in the current collaboration
    • JAPAN is currently in development at www.github.com/JeffersonLab/Japan (private)