Difference between revisions of "Full Shift Checklist"

From PREX Wiki
Jump to navigationJump to search
Line 14: Line 14:
  
 
== [[Beam and Hall checks]] ==
 
== [[Beam and Hall checks]] ==
== [[Left Arm Checks]] ==
 
== [[Right Arm Checks]] ==
 
== [[CODA#Instructions for shift checklist|CODA]] ==
 
== [[BTA|Beamtime accounting]] ==
 
  
 +
* Is alarm handler running on hacweb7?
 +
* Beam Energy (GeV)
 +
* Beam current (µA)
 +
* Downstream raster (B) on? Yes/No
 +
* Raster size (x:y mm, see log 3654466 )?
 +
* Fast feedback on? Yes/No
 +
* Beam Position Monitor X/Y (mm) A
 +
* Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
 +
* BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
 +
* Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
 +
* Current Target
 +
* Argon pressure (psi)
 +
* Ethane pressure (psi)
 +
* CO2 pressure (psi)
 +
* Visual Hall Inspection OK?
 +
* Truck ramp door closed ( use the camera to see the door from mirror)?
 +
* Septum current (A) and polarity?
 +
* Upstream/downstream corrector currents (A) ?
  
 
+
== [[Left Arm Checks]] ==
Is alarm handler running on hacweb7?
 
Is the volume up on hacweb7? (both hardware and software)
 
 
 
Beam Energy (GeV)
 
Beam current (µA)
 
Downstream raster (B) on? Yes/No
 
Raster size (x:y mm, see log 3654466 )?
 
Fast feedback on? Yes/No
 
Beam Position Monitor X/Y (mm) A
 
Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
 
BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
 
Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
 
 
 
 
 
Current Target
 
Argon pressure (psi)
 
Ethane pressure (psi)
 
CO2 pressure (psi)
 
Visual Hall Inspection OK?
 
Truck ramp door closed ( use the camera to see the door from mirror)?
 
Septum current (A) and polarity?
 
Upstream/downstream corrector currents (A) ?
 
  
 
Left Arm momentum (GeV)
 
Left Arm momentum (GeV)
Line 59: Line 51:
 
Left s0/s2m HV on (s0 may be off for production, check with expert)?
 
Left s0/s2m HV on (s0 may be off for production, check with expert)?
 
Check online plots (y/n)? -LHRS
 
Check online plots (y/n)? -LHRS
 +
 +
== [[Right Arm Checks]] ==
  
 
Right arm momentum (GeV)
 
Right arm momentum (GeV)
Line 76: Line 70:
 
S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)?
 
S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)?
 
Check online plots (y/n)? -RHRS
 
Check online plots (y/n)? -RHRS
 +
 +
== [[CODA#Instructions for shift checklist|CODA]] ==
  
 
Latest run type (Test, Physics,..)
 
Latest run type (Test, Physics,..)
Line 84: Line 80:
 
Latest run number
 
Latest run number
 
<del>Dead time (%)</del>
 
<del>Dead time (%)</del>
Beamtime accounting table submitted?
+
 
 +
 
 +
== [[BTA|Beamtime accounting]] ==
 +
 
 +
* Beamtime accounting table submitted?
 +
 
  
 
== In counting house ==
 
== In counting house ==
  
 +
* Is the volume up on hacweb7? (both hardware and software)
 
* <span style="color:blue">VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room </span>
 
* <span style="color:blue">VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room </span>
 
* Empty drip tray and place mug under spout on coffee maker
 
* Empty drip tray and place mug under spout on coffee maker

Revision as of 11:07, 12 June 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< Information for Shift Takers << Shift Checklist


Entering shift info

  • Shift leader
  • Target operator
  • Analysis expert
  • Shift (day, swing, or owl)
    • Enter the names of the shift workers (Shift leader, Target operator, Analysis expert)
    • Indicate which shift the checklist is for (day, swing, or owl)

Beam and Hall checks

  • Is alarm handler running on hacweb7?
  • Beam Energy (GeV)
  • Beam current (µA)
  • Downstream raster (B) on? Yes/No
  • Raster size (x:y mm, see log 3654466 )?
  • Fast feedback on? Yes/No
  • Beam Position Monitor X/Y (mm) A
  • Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
  • BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
  • Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
  • Current Target
  • Argon pressure (psi)
  • Ethane pressure (psi)
  • CO2 pressure (psi)
  • Visual Hall Inspection OK?
  • Truck ramp door closed ( use the camera to see the door from mirror)?
  • Septum current (A) and polarity?
  • Upstream/downstream corrector currents (A) ?

Left Arm Checks

Left Arm momentum (GeV) Left Arm Q1, Q2, D, Q3 regulartors on (yes/no, ask experts)? Left Arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Left Arm NMR OK? Yes/No Left Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Left VDC gas flow (top/bottom) on? Left VDC HV on (top/bottom)? VDC thresholds (All 4 values should be 3.0 V, yes/no) ? Left Cerenkov HV on? Left Pion rejector HV on? Left s0/s2m HV on (s0 may be off for production, check with expert)? Check online plots (y/n)? -LHRS

Right Arm Checks

Right arm momentum (GeV) Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no) Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Right Arm NMR OK? Yes/No Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Right VDC gas flow (top/bottom) on? Right VDC HV on (top/bottom)? Right Cerenkov HV on? Right Pion rejector HV on? Right s0/s2m HV on? Right SCIFI HV off (should be off during production runs, y/n)? S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? Check online plots (y/n)? -RHRS

CODA

Latest run type (Test, Physics,..) Is the auto replay script running (ask the analysis expert)? Is the APEX run list (in a white binder) completed? Please attach the left/right HV and Scalers Screenshots to the shift report Time of beginning of latest run (RHRS) Latest run number Dead time (%)


Beamtime accounting

  • Beamtime accounting table submitted?


In counting house

  • Is the volume up on hacweb7? (both hardware and software)
  • VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room
  • Empty drip tray and place mug under spout on coffee maker
    • Press the buttons on either side of the tray and pull toward you
    • Place a mug under the spout while emptying the tray (and the previous mug) in the bathroom sink
    • Replace the tray by sliding back into the machine
    • Place a mug under the spout to help keep the tray from overflowing