Difference between revisions of "Full Shift Checklist"
Line 14: | Line 14: | ||
== [[Beam and Hall checks]] == | == [[Beam and Hall checks]] == | ||
− | |||
− | |||
− | |||
− | |||
+ | * Is alarm handler running on hacweb7? | ||
+ | * Beam Energy (GeV) | ||
+ | * Beam current (µA) | ||
+ | * Downstream raster (B) on? Yes/No | ||
+ | * Raster size (x:y mm, see log 3654466 )? | ||
+ | * Fast feedback on? Yes/No | ||
+ | * Beam Position Monitor X/Y (mm) A | ||
+ | * Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools) | ||
+ | * BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog | ||
+ | * Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF)) | ||
+ | * Current Target | ||
+ | * Argon pressure (psi) | ||
+ | * Ethane pressure (psi) | ||
+ | * CO2 pressure (psi) | ||
+ | * Visual Hall Inspection OK? | ||
+ | * Truck ramp door closed ( use the camera to see the door from mirror)? | ||
+ | * Septum current (A) and polarity? | ||
+ | * Upstream/downstream corrector currents (A) ? | ||
− | + | == [[Left Arm Checks]] == | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Left Arm momentum (GeV) | Left Arm momentum (GeV) | ||
Line 59: | Line 51: | ||
Left s0/s2m HV on (s0 may be off for production, check with expert)? | Left s0/s2m HV on (s0 may be off for production, check with expert)? | ||
Check online plots (y/n)? -LHRS | Check online plots (y/n)? -LHRS | ||
+ | |||
+ | == [[Right Arm Checks]] == | ||
Right arm momentum (GeV) | Right arm momentum (GeV) | ||
Line 76: | Line 70: | ||
S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? | S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? | ||
Check online plots (y/n)? -RHRS | Check online plots (y/n)? -RHRS | ||
+ | |||
+ | == [[CODA#Instructions for shift checklist|CODA]] == | ||
Latest run type (Test, Physics,..) | Latest run type (Test, Physics,..) | ||
Line 84: | Line 80: | ||
Latest run number | Latest run number | ||
<del>Dead time (%)</del> | <del>Dead time (%)</del> | ||
− | Beamtime accounting table submitted? | + | |
+ | |||
+ | == [[BTA|Beamtime accounting]] == | ||
+ | |||
+ | * Beamtime accounting table submitted? | ||
+ | |||
== In counting house == | == In counting house == | ||
+ | * Is the volume up on hacweb7? (both hardware and software) | ||
* <span style="color:blue">VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room </span> | * <span style="color:blue">VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room </span> | ||
* Empty drip tray and place mug under spout on coffee maker | * Empty drip tray and place mug under spout on coffee maker |
Revision as of 11:07, 12 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< Information for Shift Takers << Shift Checklist
Entering shift info
- Shift leader
- Target operator
- Analysis expert
- Shift (day, swing, or owl)
- Enter the names of the shift workers (Shift leader, Target operator, Analysis expert)
- Indicate which shift the checklist is for (day, swing, or owl)
Beam and Hall checks
- Is alarm handler running on hacweb7?
- Beam Energy (GeV)
- Beam current (µA)
- Downstream raster (B) on? Yes/No
- Raster size (x:y mm, see log 3654466 )?
- Fast feedback on? Yes/No
- Beam Position Monitor X/Y (mm) A
- Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
- BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
- Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
- Current Target
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)
- Visual Hall Inspection OK?
- Truck ramp door closed ( use the camera to see the door from mirror)?
- Septum current (A) and polarity?
- Upstream/downstream corrector currents (A) ?
Left Arm Checks
Left Arm momentum (GeV) Left Arm Q1, Q2, D, Q3 regulartors on (yes/no, ask experts)? Left Arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Left Arm NMR OK? Yes/No Left Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Left Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Left VDC gas flow (top/bottom) on? Left VDC HV on (top/bottom)? VDC thresholds (All 4 values should be 3.0 V, yes/no) ? Left Cerenkov HV on? Left Pion rejector HV on? Left s0/s2m HV on (s0 may be off for production, check with expert)? Check online plots (y/n)? -LHRS
Right Arm Checks
Right arm momentum (GeV) Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no) Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Right Arm NMR OK? Yes/No Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Right VDC gas flow (top/bottom) on? Right VDC HV on (top/bottom)? Right Cerenkov HV on? Right Pion rejector HV on? Right s0/s2m HV on? Right SCIFI HV off (should be off during production runs, y/n)? S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? Check online plots (y/n)? -RHRS
CODA
Latest run type (Test, Physics,..)
Is the auto replay script running (ask the analysis expert)?
Is the APEX run list (in a white binder) completed?
Please attach the left/right HV and Scalers Screenshots to the shift report
Time of beginning of latest run (RHRS)
Latest run number
Dead time (%)
Beamtime accounting
- Beamtime accounting table submitted?
In counting house
- Is the volume up on hacweb7? (both hardware and software)
- VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room
- Empty drip tray and place mug under spout on coffee maker
- Press the buttons on either side of the tray and pull toward you
- Place a mug under the spout while emptying the tray (and the previous mug) in the bathroom sink
- Replace the tray by sliding back into the machine
- Place a mug under the spout to help keep the tray from overflowing