==To Do== | ==To Do== | ||
+ | |||
+ | |||
+ | |||
+ | Short term (today): | ||
+ | Day/swing-Moller lock, optics check, adiabatic damping, (ffb?), | ||
+ | Swing/owl-Find chole and make sure same position as before, sieve in Ca48 run, detector alignment check, Q2. Stop by 6:30am. | ||
+ | |||
+ | Longer term plan: | ||
+ | Accelerator Tasks: | ||
+ | Group 1: | ||
+ | 1. Moller lock | ||
+ | 2. Vwein/solenoid adjustment for vertical transverse | ||
+ | 3. Spin Dance | ||
+ | 4. VWein/solenoid fine tune optimization to minimize v. transverse for both flip right and flip left at new HWein angle. | ||
+ | |||
+ | Group 2: | ||
+ | 1. Damping test, Matching improvement | ||
+ | 2. Tune beam for low backgrounds through the Compton chicane | ||
+ | 3. FFB commissioning | ||
+ | |||
+ | Group 3: | ||
+ | 1. Spot size | ||
+ | 2. Phase Advance | ||
+ | |||
+ | ———————————————— | ||
+ | Hall Tasks: | ||
+ | Restarting in hall: | ||
+ | |||
+ | *- check target position and raster size using spot++ and carbon hole | ||
+ | * we should start with counting run using VDCs and downstream detectors (careful setup/backout, but no access required) | ||
+ | * remember safeguards | ||
+ | o ramp rate <10uA/sec (in small steps or slower if necessary) | ||
+ | o run at collimator center, but verify target is where we expect (or else, framehunt to be certain) | ||
+ | o keep an eye of dp / Teifenbach measurement | ||
+ | |||
+ | |||
+ | Soon we need: | ||
+ | ———————————————— | ||
+ | *- pulsed beam synch check | ||
+ | *Low current -> high current cavities | ||
+ | * Sieve IN Ca-48 counting run (to hunt inelastic cross-sections) | ||
+ | *Recheck of det alignment | ||
+ | *another Q2 measurement | ||
[[Category:Meetings]][[Category:Task List]] | [[Category:Meetings]][[Category:Task List]] |
Revision as of 14:10, 6 January 2020
Back to Main Page
Logistic information
Time: Daily at 3:30pm Location: Counting house conference room
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 256 205 934 Bluejeans link: https://bluejeans.com/256205934
Standing Agenda
- RC Status Report
- Subsystem status reports
- Integrating DAQ
- Counting DAQ
- Main detectors
- SAMs
- AT
- PQB
- Beam Monitors
- Dithering
- Target
- WAC
- Compton
- Shifts
- Other
- Daily Run Plan
To Do
Short term (today): Day/swing-Moller lock, optics check, adiabatic damping, (ffb?), Swing/owl-Find chole and make sure same position as before, sieve in Ca48 run, detector alignment check, Q2. Stop by 6:30am.
Longer term plan: Accelerator Tasks: Group 1:
1. Moller lock
2. Vwein/solenoid adjustment for vertical transverse
3. Spin Dance
4. VWein/solenoid fine tune optimization to minimize v. transverse for both flip right and flip left at new HWein angle.
Group 2:
1. Damping test, Matching improvement 2. Tune beam for low backgrounds through the Compton chicane 3. FFB commissioning
Group 3:
1. Spot size 2. Phase Advance
———————————————— Hall Tasks: Restarting in hall:
- - check target position and raster size using spot++ and carbon hole
- we should start with counting run using VDCs and downstream detectors (careful setup/backout, but no access required)
- remember safeguards
o ramp rate <10uA/sec (in small steps or slower if necessary) o run at collimator center, but verify target is where we expect (or else, framehunt to be certain) o keep an eye of dp / Teifenbach measurement
Soon we need:
————————————————
- - pulsed beam synch check
- Low current -> high current cavities
- Sieve IN Ca-48 counting run (to hunt inelastic cross-sections)
- Recheck of det alignment
- another Q2 measurement