Daily Meetings
From PREX Wiki
Jump to navigationJump to search
Back to Main Page
Logistic information
Time: Daily at 3:15pm Location: Counting house conference room
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 256 205 934 Bluejeans link: https://bluejeans.com/256205934
Standing Agenda
- RC Status Report - https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit?usp=sharing
- Subsystem status reports
- Integrating DAQ
- Counting DAQ
- Main detectors
- SAMs
- AT
- PQB
- Beam Monitors
- Dithering
- Target
- WAC
- Compton
- Shifts
- Other
- Daily Run Plan
To Do
Short term (today): Day/swing-Moller lock, optics check, adiabatic damping, (ffb?), Swing/owl-Find chole and make sure same position as before, sieve in Ca48 run, detector alignment check, Q2. Stop by 6:30am.
Longer term plan:
Accelerator Tasks:
Group 1:
1. Moller lock 2. Vwein/solenoid adjustment for vertical transverse 3. Spin Dance 4. VWein/solenoid fine tune optimization to minimize v. transverse for both flip right and flip left at new HWein angle.
Group 2:
1. Damping test, Matching improvement 2. Tune beam for low backgrounds through the Compton chicane 3. FFB commissioning
Group 3:
1. Spot size 2. Phase Advance
———————————————— Hall Tasks: Restarting in hall:
- - check target position and raster size using spot++ and carbon hole
- we should start with counting run using VDCs and downstream detectors (careful setup/backout, but no access required)
- remember safeguards
o ramp rate <10uA/sec (in small steps or slower if necessary) o run at collimator center, but verify target is where we expect (or else, framehunt to be certain) o keep an eye of dp / Teifenbach measurement
Soon we need:
————————————————
- - pulsed beam synch check
- Low current -> high current cavities
- Sieve IN Ca-48 counting run (to hunt inelastic cross-sections)
- Recheck of det alignment
- another Q2 measurement