Difference between revisions of "Full Shift Checklist"
From PREX Wiki
Jump to navigationJump to searchLine 60: | Line 60: | ||
* Is Left VDC gas flow (top/bottom) on? | * Is Left VDC gas flow (top/bottom) on? | ||
* Left VDC HV on (top/bottom)? | * Left VDC HV on (top/bottom)? | ||
− | VDC thresholds (All 4 values should be 3.0 V, yes/no) ? | + | * VDC thresholds (All 4 values should be 3.0 V, yes/no) ? |
− | Left Cerenkov HV on? | + | * <del> Left Cerenkov HV on? </del> |
− | Left Pion rejector HV on? | + | * <del> Left Pion rejector HV on? </del> |
− | Left s0/s2m HV on (s0 may be off for production, check with expert)? | + | * <del> Left s0/s2m HV on (s0 may be off for production, check with expert)? </del> |
− | Check online plots (y/n)? -LHRS | + | * Check online plots (y/n)? -LHRS |
== [[Right Arm Checks]] == | == [[Right Arm Checks]] == | ||
− | Right arm momentum (GeV) | + | * Right arm momentum (GeV) |
− | Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no) | + | * Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no) |
− | Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) | + | * Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) |
− | Right Arm NMR OK? Yes/No | + | * Right Arm NMR OK? Yes/No |
− | Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) | + | * Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) |
− | Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) | + | * Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) |
− | Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) | + | * Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) |
− | Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) | + | * Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) |
− | Is Right VDC gas flow (top/bottom) on? | + | * Is Right VDC gas flow (top/bottom) on? |
− | Right VDC HV on (top/bottom)? | + | * Right VDC HV on (top/bottom)? |
− | Right Cerenkov HV on? | + | * <del> Right Cerenkov HV on? </del> |
− | Right Pion rejector HV on? | + | * <del> Right Pion rejector HV on? </del> |
− | Right s0/s2m HV on? | + | * <del> Right s0/s2m HV on?</del> |
− | Right SCIFI HV off (should be off during production runs, y/n)? | + | * <del> Right SCIFI HV off (should be off during production runs, y/n)?</del> |
− | S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? | + | * <del> S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)?</del> |
− | Check online plots (y/n)? -RHRS | + | * Check online plots (y/n)? -RHRS |
== [[CODA#Instructions for shift checklist|CODA]] == | == [[CODA#Instructions for shift checklist|CODA]] == |
Revision as of 12:22, 12 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< Information for Shift Takers << Shift Checklist
Entering shift info
- Shift leader
- Target operator
- Analysis expert
- Shift (day, swing, or owl)
- Enter the names of the shift workers (Shift leader, Target operator, Analysis expert)
- Indicate which shift the checklist is for (day, swing, or owl)
Beam and Hall checks
- Is alarm handler running on hacweb7?
- Beam Energy (GeV)
- Beam current (µA)
- Downstream raster (B) on? Yes/No
- Raster size (x:y mm, see log 3654466 )?
- Fast feedback on? Yes/No
- Beam Position Monitor X/Y (mm) A
- Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
- BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
- Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
- Current Target
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)
- Visual Hall Inspection OK?
Truck ramp door closed ( use the camera to see the door from mirror)?- Septum current (A) and polarity?
- Upstream/downstream corrector currents (A) ?
- Parity Checks
- IHWP setting (IN/OUT)
- the button that is depressed is the setting
- PGUN and parity controls
- RHWP setting (value like 1532)
- Wien settings?
- Spin controls - jmenu search for spin
- VWienAngle
- Phi_FG
- HWienAngle
- FLIP(-LEFT) (-RIGHT)
- IHWP setting (IN/OUT)
Left Arm Checks
- Left Arm momentum (GeV)
- Left Arm Q1, Q2, D, Q3 regulartors on (yes/no, ask experts)?
- Left Arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen)
- Left Arm NMR OK? Yes/No
- Left Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Left Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Left Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Left Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Is Left VDC gas flow (top/bottom) on?
- Left VDC HV on (top/bottom)?
- VDC thresholds (All 4 values should be 3.0 V, yes/no) ?
Left Cerenkov HV on?Left Pion rejector HV on?Left s0/s2m HV on (s0 may be off for production, check with expert)?- Check online plots (y/n)? -LHRS
Right Arm Checks
- Right arm momentum (GeV)
- Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no)
- Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen)
- Right Arm NMR OK? Yes/No
- Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G)
- Is Right VDC gas flow (top/bottom) on?
- Right VDC HV on (top/bottom)?
Right Cerenkov HV on?Right Pion rejector HV on?Right s0/s2m HV on?Right SCIFI HV off (should be off during production runs, y/n)?S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)?- Check online plots (y/n)? -RHRS
CODA
Latest run type (Test, Physics,..)
Is the auto replay script running (ask the analysis expert)?
Is the APEX run list (in a white binder) completed?
Please attach the left/right HV and Scalers Screenshots to the shift report
Time of beginning of latest run (RHRS)
Latest run number
Dead time (%)
Beamtime accounting
- Beamtime accounting table submitted?
In counting house
- Is the volume up on hacweb7? (both hardware and software)
- VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room
- Empty drip tray and place mug under spout on coffee maker
- Press the buttons on either side of the tray and pull toward you
- Place a mug under the spout while emptying the tray (and the previous mug) in the bathroom sink
- Replace the tray by sliding back into the machine
- Place a mug under the spout to help keep the tray from overflowing