Difference between revisions of "Target Operator"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 1: | Line 1: | ||
− | |||
− | |||
[[Main_Page|<B>PREX Main</B>]] << [[Information for Shift Takers]] <br><br> | [[Main_Page|<B>PREX Main</B>]] << [[Information for Shift Takers]] <br><br> | ||
− | + | === Useful links === | |
+ | * [pdf of Training Slides] | ||
+ | * [[RunPlanDaily | Daily Run Plan]] | ||
+ | * [[Shift_Leader| Shift Leader Duties]] | ||
+ | |||
+ | == Target Operator Responsibilities == | ||
* Operate the target ladder in conjunction with the run plan -> [[Moving the target]] | * Operate the target ladder in conjunction with the run plan -> [[Moving the target]] | ||
* Monitor the target system, paying close attention to the target sensors | * Monitor the target system, paying close attention to the target sensors | ||
* Make logbook posts of the target status, including sensor strip charts | * Make logbook posts of the target status, including sensor strip charts | ||
− | * | + | * Coordinate with the Shift Leader to ensure all tasks are performed |
− | == | + | == Suggested tasks for Target Operator == |
* Start integrating mode runs (during production) | * Start integrating mode runs (during production) | ||
* Start Compton runs | * Start Compton runs | ||
Line 16: | Line 19: | ||
** Monitor Compton background rates | ** Monitor Compton background rates | ||
− | <B> | + | <span style="color:red">Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span> |
− | + | <br><br> | |
− | |||
[[Category:HOW TO]] [[Category:TO]] | [[Category:HOW TO]] [[Category:TO]] |
Revision as of 08:59, 19 June 2019
PREX Main << Information for Shift Takers
Useful links
- [pdf of Training Slides]
- Daily Run Plan
- Shift Leader Duties
Target Operator Responsibilities
- Operate the target ladder in conjunction with the run plan -> Moving the target
- Monitor the target system, paying close attention to the target sensors
- Make logbook posts of the target status, including sensor strip charts
- Coordinate with the Shift Leader to ensure all tasks are performed
Suggested tasks for Target Operator
- Start integrating mode runs (during production)
- Start Compton runs
- Monitor Compton data
- Monitor Compton background rates
Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.