WAC Notes August 5 2019
From PREX Wiki
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes August 4 2019 << >> WAC Notes August 6 2019
August 5 2019
Daily Meeting BlueJeans
Production Run List
- Slug 29, Wein_Left, IHWP_IN: continued
- return to production running mid-Swing shift
- run 3853-3854: larger MD widths, very large (3X larger) reg Y slopes (hitting target frame?)
- run3855-3856: good production running, widths and slope now normal
- slug 29 continues into 06 Aug.
Non-Production Runs and Bad Runs
- moller and compton studies