Run plan history
From PREX Wiki
Jump to navigationJump to search
PREX Main << Run Coordinator Tools << RunPlanDaily
Copy weekly run plan tables here.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Friday, June 14 | Owl | ||
Day | |||
Swing | |||
Monday, June 17 | Owl | ||
Day | Last day for planned collaboration work in Hall. | Expecting 2A alignment | |
Swing | Vacuum connections between US pipe and target and between target and collimator box. | ||
Tuesday, June 18 | Owl | ||
Day | Pump down the entire pivot to dump region; Expecting 2B alignment | ||
Swing | Target software checks | ||
Wednesday, June 19 | Owl | ||
Day | Hall Closed. Final Checklist. Possible first beam in Hall A | ||
Swing | Continue beam in Hall A for tuning. Start low beam checkout. | ||
Thursday, June 20 | Owl | Continue low beam current checkout. | Completed Collimator search. |
Day | Tuning | ||
Swing | Tune up and Low current commissioning. | ||
Friday, June 21 | Owl | Low current commissioning. Started optics | Commissioned 45deg and 90deg targets. Calibrated ion chambers. Bullseye scan. |
Day | High current + Compton rate tuning. | ||
Swing | High current calibration after tuning (Caryn). Low current commissioning. Restart Optics (Seamus, Sanghwa, Ryan) | Basic run quality plot macro needed (Sanghwa). | |
Saturday, June 22 | Owl | Opportunistic: Beam Modulation (Paul K, Vectoria) | ESR 15K helium issue, scattering chamber vacuum degration investigation |
Day | Optics. | ||
Swing | Low current cavity (Ye, Cip). Minimum chase. | ||
Sunday, June 23 | Owl | Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | Inner edge search DONE. |
Day | Minimize width. | ||
Swing | Minimize width. Minimum chase. | ||
Monday, June 24 | Owl | Quartz align; quartz rate. (Dustin) | |
Day | Optics verification. | ESR 15K helium repair is ongoing. | |
Swing | No beam. | ||
Tuesday, June 25 | Owl | No beam. shift cancelled. | |
Day | Target cooling down. | shift cancelled | |
Swing | Optics. | Vacuum issue. No beam for the whole shift. | |
Wednesday, June 26 | Owl | Optics. | |
Day | Optics. Send beam through Compton chicane. | Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened. | |
Swing | Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. | Cavity lock commissioning completed | |
Thursday, June 27 | Owl | Optics (db scan), Q2 measurement, detector alignment | db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon |
Day | Send beam through Compton chicane, Compton commissioning. | Fail to send beam through compton chicane | |
Swing | Rate scan (Dustin) and SAM shutter test, raster size verification | All completed | |
Friday, June 28 | Owl | Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-() | |
Day | Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning | ||
Swing | Compton commissioning, current + PITA scan, finish up high current test, BMW | Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB. | |
Saturday, June 29 | Owl | Production (natural Pb, Carbon) | Down due to target vacuum problem |
Day | Production with 208Pb? Rate studies, Phase 1. | Down due to target vacuum problem | |
Swing | Sweep + access. Phase 2 rate studies | Down due to target vacuum problem | |
Sunday, June 30 | Owl | 208Pb Production. Target Fleet Commissioning | Down due to target vacuum problem |
Day | Moller commissioning. | Down due to target vacuum problem | |
Swing | Optics - Y target finding, Bandwidth. Collimator heating axis study. | Down due to target vacuum problem | |
Monday, July 1 | Owl | Down due to target vacuum problem | |
Day | Beam Studies | Target vacuum leak source found, recovery in progress | |
Swing | Site power loss while ramping up HRS magnets after target cool down | ||
Tuesday, July 2 | Owl | Down due to the site power loss, https://logbooks.jlab.org/entry/3697845 | |
Day | Down due to the site power loss | ||
Swing | Down due to the site power loss | ||
Wednesday, July 3 | Owl | Down due to the site power loss | |
Day | Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon Currently we are: Sieve OUT Integrating mode detector Raster off (tested ok yesterday) Cavity in low current mode | ||
Swing | |||
Thursday, July 4 | Owl | Restricted | |
Day | Restricted | ||
Swing | Restricted | ||
Friday, July 5 | Owl | Restricted | |
Day | Target cool down, Magnet ramp up | Restricted->Controlled access | |
Swing | Cold target monitoring, Magnet ramp up | Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL | |
Saturday, July 6 | Owl | Cold target monitoring. | Power outage in SL, no beam |
Day | Got 70uA to dump, then Cold target monitoring. | 8am - 5S optics, tune B after 5S | |
Swing | Cold target monitoring. | Tuned accelerator, took beam away, 5S optics, tune B after 5S | |
Sunday, July 7 | Owl | Cold target monitoring. | Tuned accelerator, took beam away, 5S optics, tune B after 5S |
Day | low current cav commissioning (for EPICS) and beamline optics | Tuned C, then tune beam to A, then 20nA CW, then back taken for retuning | |
Swing | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | tuning for most of shift, hope for Production CW | |
Monday, July 8 | Owl | no beam | |
Day | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Production CW , | |
Swing | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Production CW | |
Tuesday, July 9 | Owl | High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan | Parasitic CW , tuning for higher passes |
Day | Low current, different triggers on C, Pb | Parasitic CW , tuning for higher passes | |
Swing | Low current GEMS,Sieve/switch to integrating (and remove S0?) | Parasitic CW , tuning for higher passes | |
Wednesday, July 10 | Owl | Detector alignment and low current counting mode | CW low current |
Day | High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan Detailed plan | 50uA | |
Swing | Moller commissioning | <2uA | |
Thursday, July 11 | Owl | Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on) | Experts are looking at data, FFB was not working |
Day | Hysteresis recovery, machine retuning | Hysteresis recovery done, no beam in the hall. | |
Swing | No beam in the hall | ||
Friday, July 12 | Owl | Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies | No beam in the hall |
Day | Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian) | No beam in the hall | |
Swing | Try FFB and 208Pb production. | No beam in the hall | |
Saturday, July 13 | Owl | Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). | no beam in the hall |
Day | Continue with owl shift plan. | No beam | |
Swing | Continue with today's owl shift plan | got beam ~8 pm. Checked raster size and started production data taking without FFB | |
Sunday, July 14 | Owl | Production+ analysis. FFB (30 min), BMW (30 min), Aq | FFB tried, but didn't work. |
Day | Production+ analysis | ||
Swing | Production+ analysis | ||
Monday, July 15 | Owl | Production+ analysis. | Except ~3 hour down time, we took good data |
Day | FFB commissioning until 10AM. Take run with FFB (if ready) or w/o FFB (if not ready) until MOLLER experts walk in for MOLLER commissioning. | MOLLER polarimeter commissioning is going on | |
Swing | MOLLER commissioning | ||
Tuesday, July 16 | Owl | MOLLER Polarimeter and FFB commissioning | |
Day | production after pass change | ||
Swing | change IHWP ('out'), BPM and BCM calibration (Caryn) | Done | |
Wednesday, July 17 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | HallB tuning no beam and frame hunting I | ||
Swing | frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster | ||
Thursday, July 18 | Owl | IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off | |
Day | 50 microAmp production, PQB study, FFB test | full survey to solve the RHRS Q2 | |
Swing | Moller measurement | ||
Friday, July 19 | Owl | Moller measurement | ready for the spin dance, may need short measurement to be complete. |
Day | control access for the RHRS Q2 magnet tripping | ||
Swing | Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
Saturday, July 20 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | control access for Q2 debugging | beam stop at 8:00am and back at 4:00pm | |
Swing | PITA/IA scan at 50uA, production at 50uA | ||
Sunday, July 21 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | production at 50uA | RHRS Q2 magnet is down | |
Swing | Qsqr measurement and production at 50uA | RHRS Q2 magnet is down | |
Monday, July 22 | Owl | production at 50uA, Moller measurement was paused | LCW leak in the west arc |
Day | control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode | LCW leak >10 hours | |
Swing | Qsq measurement, Detector alignment at low current. | 1 hour | |
Tuesday, July 23 | Owl | No beam due to LCW leak | >30h |
Day | control access for Q2 magnet, Compton laser work | Q2 is recovered around 12:00pm | |
Swing | No acceptable beam | 1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 | |
Wednesday, July 24 | Owl | No acceptable beam until 6:30am | Dump puck |
Day | Moller and Spin dance measurement | Success!! Final Wien -13.3 | |
Swing |
|
Short access for changing the cable to integrate mode and changing the Compton attenuator | |
Thursday, July 25 | Owl | production at 70uA | |
Day |
|
BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers | |
Swing |
|
||
Friday, July 26 | Owl | production at 70uA | deltaT on the collimator increased. Water out temp exceeding our set limits |
Day |
|
receiver swapped; DO NOT MOVE THE TARGET! | |
Swing |
|
||
Saturday, July 27 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day | production at 70uA; DO NOT MOVE THE TARGET! | ||
Swing | production at 70uA; DO NOT MOVE THE TARGET! | ||
Sunday, July 28 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing | production at 70uA; DO NOT MOVE THE TARGET! | ||
Monday, July 29 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing |
|
||
Tuesday, July 30 | Owl | low current running beginning at 8am (if approved) | |
Day | Target fix | ||
Swing |
|
||
Wednesday, July 31 | Owl | production at 70uA | |
Day |
|
| |
Swing |
|
||
Thursday, August 1 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | Production running at 70uA | ||
Friday, August 2 | Owl | Production running at 70uA | |
Day |
|
raster changed to 4 x 5 mm2 for slug 26 | |
Swing | Production running at 70uA | ||
Saturday, August 3 | Owl | Production running at 70uA | |
Day |
|
changed to Pb9 target | |
Swing | Production running at 70uA | ||
Sunday, August 4 | Owl | Production running at 70uA | |
Day | Moller starting at 8am | ||
Swing | more Moller | ||
Monday, August 5 | Owl | more Moller | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 6 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Wednesday, August 7 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Thursday, August 8 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Friday, August 9 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Saturday, August 10 | Owl |
|
|
Day |
|
||
Swing |
|
||
Sunday, August 11 | Owl |
|
|
Day |
|
||
Swing | Production running at 70uA |