WAC Notes March 5 2020

From PREX Wiki
Revision as of 13:15, 5 March 2020 by Ajzec (talk | contribs)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes March 4 2020 << >> WAC Notes March 6 2020

March 5 2020

Daily Meeting BlueJeans


Production Run List - Slug 152 - IHWP IN - Flip-LEFT - Production

Slug started on March 4 at approx. 2 AM.

Production Run List - Slug 153 - IHWP OUT - Flip-LEFT - Production

Slug started at approx 1:30 on March 5

Non-Production Runs and Bad Runs

  • Runs 6897 - 6908
    • Down for beam tuning, injector work, and recovery
  • Run 6911
    • Has 150 uA current, but marked as Bad because no EventCut passing events
  • Run 6912
    • Down for further injector steering

Issues

  • Correlation between 12X and 12Y, is this going to hurt us?

Updates