WAC Notes March 4 2020
From PREX Wiki
Jump to navigationJump to searchDocumentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes March 3 2020 << >> WAC Notes March 5 2020
March 4 2020
Daily Meeting BlueJeans
Production Run List - Slug 152 - IHWP IN - Flip-LEFT - Production
Slug started on March 4 at approx. 2 AM.
- Good - Run 6889
- High Aq widths, above 700 ppm. Applies to all runs before injector steering.
- Good - Run 6890
- Y BPMs correlated with 12X.
- Good - Run 6891
- Good - Run 6892
- Good - Run 6893
- High Aq mean, even with widths
- Good - Run 6894
- Good - Run 6895
- Good - Run 6896
- Runs 6897 - 6908 are junk for injector + beam studies
- Good - Run 6909
- Good - Run 6910
- Good - Run 6913
- Good - Run 6914
- Good - Run 6915
- Good - Run 6916
Non-Production Runs and Bad Runs
- Runs 6897 - 6908
- Down for beam tuning, injector work, and recovery
- Run 6911
- Has 150 uA current, but marked as Bad because no EventCut passing events
- Run 6912
- Down for further injector steering