  • Is alarm handler running on hacweb7?
  • Is the volume up on hacweb7? (both hardware and software)
  • Beam Energy (GeV)
  • Beam current (µA)
  • Downstream raster (B) on? Yes/No
  • Raster size (x:y mm, see log 3654466 )?
  • Fast feedback on? Yes/No
  • Beam Position Monitor X/Y (mm) A
  • Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
  • BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
  • Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
  • VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door
  • Current Target
  • Argon pressure (psi)
  • Ethane pressure (psi)
  • CO2 pressure (psi)
  • Visual Hall Inspection OK?
  • Truck ramp door closed ( use the camera to see the door from mirror)?
  • Septum current (A) and polarity?
  • Upstream/downstream corrector currents (A) ?