PowerDownRestartHiLumPlan
From PREX Wiki
Revision as of 21:28, 5 July 2019 by Kent Paschke (talk | contribs) (Created page with "THE plan. #<font color=blue> If not yet taken, harp scans </font> #* (1H04A, 1H04B) verify intrinsic size at target (Previous spot 100 um x by 550um y. We need at least (15...")
THE plan.
- If not yet taken, harp scans
- (1H04A, 1H04B) verify intrinsic size at target (Previous spot 100 um x by 550um y. We need at least (150um)x(150um) area.
- C-Hole target, verify spot
- 20 nA, spot ++
- Turn on S0 voltages (or S3 if S0 is removed)
- Find C-hole
- verify raster size with C-Hole. Log with Quadrupole fields
- Establish beam on lead target
- at 1uA and nominal raster, record cavity positions for nominal collimator center (x=0.6, y=0.4mm).
- SAM voltages
- 50uA on natural Pb-diamond, set SAM HV (Devi)
- BMW calibration
- tune beam, slow lock on and FFB on, exercise BMW, check no ion chamber trips, check pauses locks and FFB
- low current 2-3uA, exercise BMW, check BPM signals, check no ion chamber issues
- PITA/IA scan
- FFB on, target lock on. BMW off
- PITA scan. +/- 1500 counts, 5 points, 1-2 minutes each. (expected: 0.12 ppm/count)
- IA scan +/- 20,000 counts, 5 points, 1-2 minutes each. (should be approx +/- 500 ppm)
- Short "production mode" lead measurement
- FFB on. Target lock on.
- BMW on regular cycling
- Aq feedback
- All HV off in HRS hut, except quartz
- Target lock (0.6mm, 0.4mm)
- 50 uA on lead. 20 minutes.
- Look at
- Collimator water temp
- beamline temperatures
- Ion chamber (stability)
- SAM yields
- BCM and BPM yields, widths.
- Look at
- Current Scan for detector pedestals
- FFB on. Target lock on. Wait on each data point for target lock and FFB lock to converge.
- Beam modulation off for this scan
- Aq feedback off for this scan
- 20-55uA.
- Current Scan for bpm pedestals
- "GAINS OFF" for bpms at 50 uA.
- FFB off (to turn gains off.)
- Target lock on. Wait on each data point for target lock lock to converge.
- Beam modulation off for this scan
- Aq feedback off for this scan
- 20-55uA.
- Long "production mode" lead measurement
- FFB on. Target lock on.
- BMW on regular cycling
- Aq feedback ON
- All HV off in HRS hut, except quartz
- Target lock (0.6mm, 0.4mm)
- 50 uA on lead. 60 minutes.
- Establish beam on thick (90deg) Carbon target
- record cavity positions at target lock position (1uA) with nominal raster.
- turn target lock off (but leave correctors at last set value)
- 20nA beam on C target
- verify location on cavity BPMs (DO NOT USE CAVITY LOCK).
- If in wrong position, with S0 HV off go to 0.5uA to reset cavity lock to collimator se
- S0 HV on.
- Raster 10x10 to look for frame edges.
- spot++ with T1
- Look for frame edges. If none, good to go. if so, choose a raster that won't hit it.
- Production runs on carbon
- BMW on
- FFB on, target lock on.
- Aq feedback on
- Nominal raster, 65 uA. 20 min.
- Half raster. 65 uA. 20 min.
- No raster. 15 uA. 20 min.
- Nominal raster, 65 uA. 60 min.
- Half raster. 65 uA. 60 min.