CREX Detailed Production plan

From PREX Wiki
Jump to navigationJump to search

PREX version, CREX High Current Plan, CREX Calibration Plan

Production Condition Test

  1. Check that the following have been performed
    • 150uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target
    • Establish 2x2 (actual) raster. Insert Production Test target (ask Experts which one, probably Ca48). (low current, then ramp up. check collimator water, vary raster size?)
    • Set Detector and SAM voltages as needed with these target rates (Dustin M, Devi A)
  2. Check Conditions OK
    • Collimator water
    • Thermocouple temperatures
    • Radiation monitors
    • Ion chamber stability
  3. Set up Locks (these are necessary for main detectors and SAM calibration)
    • Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT)
    • Fast feedback for HallA on (iocse9) -> If it has been properly commissioned by OPS already, otherwise it can be done later
    • If beam is going through Compton, HallAComLock should probably be on
    • Should HallAMolLock be on? -> No!
  4. Parity
    • establish Aq feedback on bcm_an_us
    • document pqb conditions
    • turn on Helicity Magnets? -1000,1000 for first 2 and -200,200 for second 2?
  5. Pedestals
    • Apply pedestals to japan for SAMs and DETs and compton bpms and cavity bpms. Update bcms and bpms if necessary.
  6. Take Data
    • Take at least 1 hour of data
    • Monitor all things above and take screen shots of all parameters above and elog them.
    • Run panguin online to examine feedback, Detector widths, Monitor Widths
    • Regression slopes check from Tao
    • examine simple correlation plots with panguin (are SAMs and DETs normalized in mul tree?)