Full Shift Checklist

From PREX Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< Information for Shift Takers << Shift Checklist


This is just where I have documented changes to the shift checklist! Not really useful for anything else.



Entering shift info

  • Shift leader
  • Target operator
  • Analysis expert Suggest remove
  • Shift (day, swing, or owl)
    • Enter the names of the shift workers (Shift leader, Target operator, Analysis expert) We don't require an Analysis Expert so we should remove it from here
    • Indicate which shift the checklist is for (day, swing, or owl)

Beam and Hall checks

  • Is alarm handler running on hacweb7? Modify to: Is hall alarm handler running on hacweb7?
  • Add: Is experimental alarm handler running on hacweb7?
  • Beam Energy (GeV) Suggest remove
  • Beam current (µA)
  • Downstream raster (B) on? Yes/No
  • Raster size (x:y mm, see log 3654466 )?
  • Fast feedback on? Yes/No
  • Beam Position Monitor X/Y (mm) A
  • Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
  • Add: Are Compton slow locks functioning?
  • Add: Are target slow locks functioning?
  • Add: Is the energy lock on?
  • BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) make halog entry and contact RC
  • Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
  • Current Target
  • Argon pressure (psi)
  • Ethane pressure (psi)
  • CO2 pressure (psi)
  • Visual Hall Inspection OK?
  • Truck ramp door closed ( use the camera to see the door from mirror)? * Suggest remove
  • Septum current (A) and polarity?
  • Upstream/downstream corrector currents (A) ? * Suggest remove: we don't have correctors for our septum

Parity Checks

  • IHWP setting (IN/OUT)
    • the button that is depressed is the setting I assume these are instructions (looks ok).
    • PGUN and parity controls Do you want something specific from here?
  • RHWP setting (value like 1532)
  • Wien settings?
    • Spin controls - jmenu search for spin I assume these are instructions (looks ok).
    • VWienAngle
    • Phi_FG
    • HWienAngle
    • FLIP(-LEFT) (-RIGHT)
  • SAM HV
  • Septum HV Add

Left Arm Checks

  • Left Arm momentum (GeV)
  • Left Arm Q1, Q2, D, Q3 regulartors on (yes/no, ask experts)? Suggest removing "on" since it hints that we need it on and I think we won't use them because they are set to momentum.
  • Left Arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen)
  • Left Arm NMR OK? Yes/No
  • Left Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Left Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Left Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Left Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Is Left VDC gas flow (top/bottom) on?
  • Left VDC HV on (top/bottom)? (off normally)
  • VDC thresholds (All 4 values should be 3.0 V, yes/no) (off normally)
  • Left Cerenkov HV on? Agreed
  • Left Pion rejector HV on? Agreed
  • Main Detector HV
  • GEM HV Add "normally off"
  • Left s0/s2m HV on (s0 may be off for production, check with expert)?
  • Check online plots (y/n)? -LHRS

Right Arm Checks

Similar to Left arm
  • Right arm momentum (GeV)
  • Right Arm Q1, Q2,D,Q3 regulartor on? (yes/no)
  • Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen)
  • Right Arm NMR OK? Yes/No
  • Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G)
  • Is Right VDC gas flow (top/bottom) on?
  • Right VDC HV on (top/bottom)? (off normally)
  • Right Cerenkov HV on?
  • Right Pion rejector HV on?
  • Right s0/s2m HV on?
  • Main Detector HV
  • GEM HV
  • Right SCIFI HV off (should be off during production runs, y/n)?
  • S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)?
  • Check online plots (y/n)? -RHRS

CODA

  • Latest run type (Test, Physics,..)
  • Is the auto replay script running (ask the analysis expert)?
  • Is the APEX run list (in a white binder) completed? Agreed
  • Please attach the left/right HV and Scalers Screenshots to the shift report Suggest to modify to: Attach Hall A Tools screenshot, Septum Power supply screenshot, Septum pipe temperature screenshots, Collimator water temperature screen shots to shift report.
  • Check scalers Not sure we will keep the scalers during regular production running.
  • Time of beginning of latest run (RHRS) Modify (RHRS) to Integrating DAQ
  • Latest run number
  • Dead time (%) Agreed


Beamtime accounting

  • Beamtime accounting table submitted? Generally this is done one hour before the end of shift so I am not sure how useful it is. Unless we want them to check this at the very end of the run; but that runs into the issue that they already took ~7h of data (possibility with problems).


In counting house

  • Is the volume up on hacweb7? (both hardware and software)
  • VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall beside the door to the compter room
  • Empty drip tray and place mug under spout on coffee maker
    • Press the buttons on either side of the tray and pull toward you
    • Place a mug under the spout while emptying the tray (and the previous mug) in the bathroom sink
    • Replace the tray by sliding back into the machine
    • Place a mug under the spout to help keep the tray from overflowing