! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-
 
| rowspan="3" | Tuesday, June 25
 
| Owl
 
|
 
| No beam. shift cancelled.
 
|-
 
| Day
 
| Target cooling down.
 
| shift cancelled
 
|-
 
| Swing
 
| Optics.
 
| Vacuum issue. No beam for the whole shift.
 
|- 
 
| rowspan="3" | Wednesday, June 26
 
| Owl
 
| Optics.
 
|
 
|-
 
| Day
 
| Optics. Send beam through Compton chicane.
 
| Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened.
 
|-
 
| Swing
 
| Low current cavity lock test. Optics.  Q^2 measurement (Bob or Kent). Opportunistic: SAM test.
 
| Cavity lock commissioning completed
 
|-
 
| rowspan="3" | Thursday, June 27
 
| Owl
 
| Optics (db scan), Q2 measurement, detector alignment
 
| db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
 
|-
 
| Day
 
| Send beam through Compton chicane, Compton commissioning.
 
| Fail to send beam through compton chicane
 
|-
 
| Swing
 
| Rate scan (Dustin) and SAM shutter test, raster size verification
 
| All completed
 
|-
 
| rowspan="3" | Friday, June 28
 
| Owl
 
| Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
 
|
 
|-
 
| Day
 
| Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
 
|
 
|-
 
| Swing
 
| Compton commissioning, current + PITA scan, finish up high current test, BMW
 
| Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB.
 
|-
 
| rowspan="3" | Saturday, June 29
 
| Owl
 
|Production (natural Pb, Carbon)
 
| Down due to target vacuum problem
 
|-
 
| Day
 
| Production with 208Pb? Rate studies, Phase 1.
 
| Down due to target vacuum problem
 
|-
 
| Swing
 
| Sweep + access. Phase 2 rate studies
 
| Down due to target vacuum problem
 
|-
 
| rowspan="3" | Sunday, June 30
 
| Owl
 
| 208Pb Production. Target Fleet Commissioning
 
| Down due to target vacuum problem
 
|-
 
| Day
 
| Moller commissioning.
 
| Down due to target vacuum problem
 
|-
 
| Swing
 
| Optics - Y target finding, Bandwidth. Collimator heating axis study.
 
| Down due to target vacuum problem
 
|-
 
| rowspan="3" | Monday, July 1
 
| Owl
 
|
 
| Down due to target vacuum problem
 
|-
 
| Day
 
| Beam Studies
 
| Target vacuum leak source found, recovery in progress
 
|-
 
| Swing
 
|
 
| Site power loss while ramping up HRS magnets after target cool down
 
|-
 
| rowspan="3" | Tuesday, July 2
 
| Owl
 
|
 
| Down due to the site power loss, https://logbooks.jlab.org/entry/3697845
 
|-
 
| Day
 
|
 
| Down due to the site power loss
 
|-
 
| Swing
 
|
 
| Down due to the site power loss
 
|-style="background: #FCF3CF;
 
| rowspan="3" | Wednesday, July 3
 
| Owl
 
|
 
| Down due to the site power loss
 
|-style="background: #FCF3CF;
 
| Day
 
|
 
| Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon <br> Currently we are: <br> Sieve OUT <br> Integrating mode detector <br> Raster off (tested ok yesterday) <br> Cavity in low current mode
 
|-style="background: #FCF3CF;
 
| Swing
 
|
 
|
 
|-
 
| rowspan="3" | Thursday, July 4
 
| Owl
 
|
 
| Restricted
 
|-
 
| Day
 
|
 
| Restricted
 
|-
 
| Swing
 
|
 
| Restricted
 
|-
 
| rowspan="3" | Friday, July 5
 
| Owl
 
|
 
| Restricted
 
|-
 
| Day
 
| Target cool down, Magnet ramp up
 
| Restricted->Controlled access
 
|-
 
| Swing
 
| Cold target monitoring, Magnet ramp up
 
| Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL
 
|-
 
| rowspan="3" | Saturday, July 6
 
| Owl
 
| Cold target monitoring.
 
| Power outage in SL, no beam
 
|-
 
| Day
 
| Got 70uA to dump, then Cold target monitoring.
 
| 8am - 5S optics, tune B after 5S
 
|-
 
| Swing
 
| Cold target monitoring.
 
| Tuned accelerator, took beam away, 5S optics, tune B after 5S
 
|-
 
| rowspan="3" | Sunday, July 7
 
|Owl
 
| Cold target monitoring.
 
| Tuned accelerator, took beam away, 5S optics, tune B after 5S
 
|-
 
|Day
 
| low current cav commissioning (for EPICS) and beamline optics
 
| Tuned C, then tune beam to A, then 20nA CW, then back taken for retuning
 
|-
 
|Swing
 
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
| tuning for most of shift, hope for Production CW
 
 
|-
 
|-
 
| rowspan="3" | Monday, July 8
 
| rowspan="3" | Monday, July 8
Line 247: Line 78:
 
| No beam in the hall
 
| No beam in the hall
 
|-  
 
|-  
| rowspan="3" | Friday, July 12
+
|-style="background: #FCF3CF;
 +
| rowspan="3" | Saturday, July 13
 
|Owl
 
|Owl
 
|Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian).   
 
|Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian).   
 
|
 
|
 
|-
 
|-
 +
|-style="background: #FCF3CF;
 
| Day
 
| Day
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 +
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
 
|  
 
|  
|  
+
|
 +
|-
 
|}
 
|}
  

Revision as of 00:35, 13 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Monday, July 8 Owl no beam
Day High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Production CW ,
Swing High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Production CW
Tuesday, July 9 Owl High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan Detailed plan Parasitic CW , tuning for higher passes
Day Low current, different triggers on C, Pb Parasitic CW , tuning for higher passes
Swing Low current GEMS,Sieve/switch to integrating (and remove S0?) Parasitic CW , tuning for higher passes
Wednesday, July 10 Owl Detector alignment and low current counting mode CW low current
Day High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan Detailed plan 50uA
Swing Moller commissioning <2uA
Thursday, July 11 Owl Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on) Experts are looking at data, FFB was not working
Day Hysteresis recovery, machine retuning Hysteresis recovery done, no beam in the hall.
Swing No beam in the hall
Friday, July 12 Owl Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies No beam in the hall
Day Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian) No beam in the hall
Swing Try FFB and 208Pb production. No beam in the hall
Saturday, July 13 Owl Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian).
Day
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting