WAC Notes August 22 2019

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes August 21 2019 << >> WAC Notes August 23 2019

August 24 2019

Daily Meeting BlueJeans

Production Run List - Slug 60

Production Run List - Slug 60 In

  • Wien Flip Left, IHWP in
  • Runs 4408-4438 -Junk Beam spot size changed
  • Run 4439 - Good - 4439 - Burp cup changed from 0.2 to 0.35
  • Run 4440 - Good - 4440
  • Run 4441 - Good - 4441 - Bad beam :(
  • Run 4442 - Good - 4442 - US DD larger than avg
  • Runs 4443- 4449 - Junk Runs
  • Run 4450 - Good - 4450 - Slopes are large, working toward gett

ung beam tuned properly

  • Runs 4451-4466 - Junk
  • Run 4467 - Good - 4467 - BPMs, large beam variation, needs cut
  • Run 4468 - Good - 4468 - Slight blip in BCMs early during run.

It doesn't get cut out. It doesn't affect regression though

  • Run 4469 - Good - 4469 - Not the best beam
  • Run 4470 - Good - 4470 - Differences in BPMs and their complement

nts, Compton tuning

  • Run 4471 - Good - 4471 - Differences in BPMs and their complement

nts. Not the best beam

  • Run 4472 - Good - 4472 - Not great beam
  • Run 4473 - Good - 4473 - Good.
  • Run 4474 - Good - 4474 - Good.
  • Run 4475 - Good - 4475 - Good.
  • Run 4476 - Good - 4476 - Good.

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

Other Status Updates