Difference between revisions of "WAC Notes August 30 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
Line 55: | Line 55: | ||
== Issues == | == Issues == | ||
+ | * larger beam energy, which results in ~3.5 mm more acceptance in detector: https://logbooks.jlab.org/entry/3838447, that's also why Devi moved the detector | ||
== Updates == | == Updates == |
Revision as of 23:36, 31 August 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 29 2020 << >> WAC Notes August 31 2020
August 30 2020
Daily Meeting BlueJeans
Production Run List - Slug 207 - IHWP IN - Flip-RIGHT - Production
- Good - Run 8104
- Good - Run 8105
- Good - Run 8106
- Good - Run 8107 -- Unser Scan
- Good - Run 8109 -- Pedestal Scan
- Good - Run 8110 -- PITA Scan
- Good - Run 8111
- Good - Run 8112
- Good - Run 8113
- Good - Run 8114
- Good - Run 8115
- Good - Run 8116
- Good - Run 8117
- Good - Run 8118
- Good - Run 8119
Production Run List - Slug 206 - IHWP OUT - Flip-RIGHT - Production
- Good - Run 8120
- Good - Run 8121
- Good - Run 8123
- Good - Run 8124
- Good - Run 8125
- Good - Run 8126
- Good - Run 8127
- Good - Run 8128 -- run 8128 - 8130 are included in slug 206, rather than next slug: 208, because there was no IHWP flip.
- Good - Run 8129
- Good - Run 8130 -- actually happened on Aug, 31. I just leave it here because it ends slug 206
Non-Production Runs and Bad Runs
- Junk - Run 8006 -- C-1%
- Junk - run 8007- 8011
Issues
- larger beam energy, which results in ~3.5 mm more acceptance in detector: https://logbooks.jlab.org/entry/3838447, that's also why Devi moved the detector